My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-06-30_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-06-30_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 12:31:10 PM
Creation date
6/8/2012 11:10:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
6/30/1996
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT WORK DESCRIPTION <br /> Project Objective <br /> The goal of this project is to accomplish reclamation of the Mine 4 entry and fan areas, as <br /> well as the lower bench highwall and bench remnant area (Map 3, Mine Plan Map). The <br /> Lower Bench Area is located in the vicinity of Mine 4, northeast of the mine entry bench and <br /> about 150 feet down slope from the entry bench. The lower bench is at the terminus end of <br /> the old conveyance system. <br /> Mine 4 is accessed via Road C, and is about 4.3 miles from the main entry gate. <br /> This project will accomplish reclamation of the Mine 4 entry area through demolition of <br /> concrete foundations, the removal of material from the mine bench outslopes and placement <br /> against the highwall. The fan area is adjacent to the mine entries, and will be reclaimed as <br /> a part of the Mine 4 reclamation project. The Lower Bench Area will be reclaimed by <br /> accomplishing partial backfilling of the highwall through excavation of material from the lower <br /> bench outslope. All cut and fill areas, bench remnants, conveyor corridor and remaining mine <br /> bench outslopes will be revegetated. <br /> Work Tasks <br /> The tasks included in the project are as follows: <br /> Task 1: Mobilization and Demobilization <br /> Task 2: Demolition <br /> Task 3: Silt Fence <br /> Task 4: Earth Work <br /> Task 5: Surface Drainage <br /> Task 6: Equipment Rental <br /> Task 7: Revegetation <br /> Task 8: Additional Furrow Construction <br /> Task 9: Additional Silt Fence <br /> TASK 1 MOBILIZATION AND DEMOBILIZATION <br /> This task shall comply with Specification 1 .0, Mobilization/Demobilization, attached. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.