My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (292)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (292)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:57:38 AM
Creation date
6/8/2012 10:16:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 MOBILIZATION/DEMOBILIZATION <br /> 1.1 DESCRIPTION <br /> This specification covers the CONTRACTOR'S operations for: <br /> a. Payment of premiums for bonds and insurance acquired specifically for the <br /> construction of this project, including premiums for performance and payment <br /> bonds; <br /> b. Movement of personnel, equipment, operation supplies, and incidentals to the <br /> project site; <br /> C. Establishment of office, buildings, plants, and other necessary facilities at the <br /> project site; <br /> d. Preparatory work at the construction site; and, <br /> e. Demobilization of CONTRACTOR'S equipment and all other facilities, final <br /> project clean-up, and for all other work for which payment is not otherwise <br /> provided for under the contract. <br /> The temporary works and construction plant may include, but not be limited to the following: <br /> a. Workshops, offices, storage yards, and construction plant and equipment <br /> including spare parts, fuels, and oil; <br /> b. Sanitation facilities, communication facilities, and sprinkler trucks; <br /> C. Contractor's electrical power system; and, <br /> d. Other items such as water, compressed air, etc., not specifically listed but <br /> required for the functioning of construction activities. <br /> 1.2 EXECUTION <br /> Mobilization <br /> Upon receipt of the Notice to Proceed, the CONTRACTOR shall furnish, mobilize, move in, and <br /> install such temporary works, equipment and construction plant as are necessary for the <br /> successful completion of the work. The CONTRACTOR shall also operate and maintain such <br /> temporary works, equipment and construction plant throughout the period of construction. <br /> All applicable temporary works, such as sanitation facilities, shall fully comply with all rules <br /> and regulations. <br /> Clearing and grubbing operations necessary for the temporary works, if any, shall also be <br /> included as mobilization. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.