My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-07_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2012-06-07_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:59:36 PM
Creation date
6/7/2012 3:48:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
6/7/2012
Doc Name
May 2012 Monthly Report
From
Battle Mountain Resources
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ri <br />BATTLE MOUNTAIN RESOURCES, INC. <br />June 04, 2012 <br />Mr. Wally Erickson <br />State of Colorado <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />May 2012 Monthly Report <br />Dear Mr. Erickson: <br />RECEIVED <br />JUN C 2012 <br />Division of Reclamation, <br />Mining & Safety <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRI), <br />San Luis Project for the month of May 2012. <br />Surface and ground water monitoring and analysis were completed for all required sites during the month <br />per the terms and conditions of the TR -32 Quality Assurance and Quality Control (QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on May 31", no water was present for sampling and <br />subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br />Pit monitoring wells on May 31'. May tailings impoundment piezometer measurements identified these <br />installations were either dry or contained less than 12 inches of water as illustrated in Table 2. Tables I <br />and 2 below identify the depth to water measurements collected for each of the site monitoring wells, <br />piezometers and lysimeters as required by the terms and conditions of the TR -32 QA/QC plan. <br />The leak detection system was measured on May 31'. A total of 810 gallons of water was excavated from <br />the leak detection system yielding a monthly average of 26.12 gpad. The tailings pond under -drain <br />measured 31 gpm. <br />During May the West Pit water treatment plant operated efficiently discharging a total of 4,510,744 <br />gallons (13.84 acre -feet) of water to Rito Seco Creek and a total of 3,423,400 gallons (10.51 acre -feet) of <br />water was transferred from the West Pit backfill to the tailings impoundment. Seepage along Rito Seco <br />Creek remained dry during the month. <br />P.O. Box 310 • San Luis, Colorado 81152 -0310 • (719) 379 -0798 • Fax (719) 379 -0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.