Laserfiche WebLink
27-Feb-12 <br />Total Pond <br />Month Area (Ac) <br />Feb-12 <br />Mar-12 <br />Apr-12 2 7- <br />May-12 <br />Jun-12 <br />Jul-12 <br />Aug-12 <br />Sep-12 <br />Oct-12 <br />Nov-12 <br />Dec-12 <br />Total <br />Evaporative Consumptive Use <br />Gross Evap <br />La) <br />1.78 <br />2.80 <br />4.59 <br />6.11 <br />7.39 <br />7.64 <br />6.88 <br />5.10 <br />3.57 <br />2.04 <br />1.53 <br />Precip <br />.. <br />Table 3 <br />Holcim (US) Inc. <br />Portland Limestone Quarry <br />2012 Substitute Water Supply Plan <br />Accounting Plan Spreadsheet <br />Mined Material <br />Dust Suppression Diversions Consumptive Use <br />Net Evap Net Evap North Pond East Pond Total Mined Mat Water Rem <br />Ifil (Ac-Ft) Gallons Gallons (Ac-Ft) (tons) (Ac-Ft) <br />-7r <br />Notes: <br />1. Total pond area is sum of the North and East Ponds, and Glory Hole Sump surface areas (acres) <br />2. Gross evaporation is taken directly from Table 1 <br />3. Total depletions will be replaced by Pueblo in the following month <br />4. Holcim will input data in cells shaded in blue. <br />Total <br />Depletions <br />(Ac-Ft) <br />