Laserfiche WebLink
Gross Annual Evaporation <br />East Pit Pond Surface Area = <br />North Pit Pond Surface Area = <br />Glory Hole Sump Surface Area = <br />Total Pond Free Water Surface Area = <br />Table 1 <br />Holcim (US) Inc. <br />Portland Limestone Quarry <br />2012 Substitute Water Supply Plan <br />Total Pond Evaporation <br />50.95 inches <br />0.19 Acres <br />2.10 Acres <br />0.08 Acres <br />2.37 Acres <br />Purecipitatio <br />Evaporation (Ac <br />Feb -12 <br />Ma r-12 <br />Apr -12 <br />May -12 <br />Jun -12 <br />Jul -12 <br />Aug -12 <br />Sep -12 <br />Oct -12 <br />Nov -12 <br />Dec -12 <br />3.5% <br />5.5% <br />9.0% <br />12.0% <br />14.5% <br />15.0% <br />13.5% <br />10.0% <br />7.0% <br />4.0% <br />3.0% <br />1.78 <br />2.80 <br />4.59 <br />6.11 <br />7.39 <br />7.64 <br />6.88 <br />5.10 <br />3.57 <br />2.04 <br />1.53 <br />0.10 <br />0.60 <br />2.27 <br />1.09 <br />0.97 <br />2.61 <br />2.38 <br />0.89 <br />1.17 <br />0.66 <br />0.35 <br />0.07 <br />0.42 <br />1.59 <br />0.76 <br />0.68 <br />1.83 <br />1.67 <br />0.62 <br />0.82 <br />0.46 <br />0.25 <br />0.14 <br />0.20 <br />0.25 <br />0.45 <br />0.56 <br />0.48 <br />0.43 <br />0.37 <br />0.23 <br />0.13 <br />0.11 <br />0.34 <br />0.47 <br />0.59 <br />1.06 <br />1.32 <br />1.15 <br />1.03 <br />0.88 <br />0.54 <br />0.31 <br />0.24 <br />Notes: <br />1) Annual Evaporation from Table 3 - Adjusted Mean Monthly in the NOAA Technical Report NWS 33. <br />2) State of Colorado Division of Water Resources, General Guidelines for Substiture Water Supply Plans for Sand and Gravel Pits (April 1, 2011); <br />Paragraph 11 for elevations below 6500 feet msl. <br />3) Precipitation data from years 2004 to 2007 for Canon City, CO. Data from NOAA. <br />4) Effective precipitation is the amount of precipitation that is actually added and stored in the soil. Effective precipitation, also called the <br />Historical Consumptive use credit, may be added to the evaporation amount as a credit. The State of Colorado calculates the effective <br />precipitation as 70% of the actual precipitation as stated in paragraph 19 of the General Guidelines for Substitue Water Supply Plans for Sand <br />and Gravel Pits. <br />