Laserfiche WebLink
1995 Reclamation Bids July 7, 1995 Page 11 <br /> Nne 4 - Bid PKA 5-360 and Amendments 1 <br /> Project work proposed for 1995 at Mine #4 consists of demolition and <br /> disposal of building and foundation remnants, backfilling material for mine <br /> bench outslopes against the highwall, contour furrow construction, and <br /> revegetation. <br /> CDMG has essentially duplicated the tasks from The Mine #3 bid for <br /> Mine #4. Comments and concerns expressed for the Mine# 3 bid are <br /> reiterated by reference for the Mine#4 bid document. <br /> Backfill amounts proposed for the Mine #4 bench and lower bench are <br /> approximately 17,5W cubic yards and 2,741 cubic yards, respectively. <br />