My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-01-05_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1996-01-05_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2021 5:47:21 PM
Creation date
6/7/2012 3:09:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/5/1996
Doc Name
Bid Documents ‎(IMP)‎
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D.W- November 15, 1995 Attn: Jim McArdel <br /> C(ntractor: Gary Rinderle Construction, tnc. Project Name: Coal Basin/Mine 3 RoclaM ation proicat <br /> A(dress: $42 33 Road Project PKA-5-359 <br /> Clifton,Colorado Location: Pitkirl County, Redstone,CO <br /> 81520 Owner State of Colorado, MLRD_ <br /> REVISED 11115196 BID SCHEDULE INVOICE # 3 <br /> PERCENTAGE COMPLETE <br /> BID BID PERCENT <br /> Tf—:M 0 DESCRIPTION 'AMOUNT COMPLETIL SVBIP_TAL TOTAL <br /> 1 Mobilization/Demobilization <br /> per specifications 10,000-00 33.40% $3,340.00 $3,340.00 <br /> 2 Demolition, per specifications 10,000,00 T 0.00% $0.00 $0.00 <br /> 3 Silt fence, per specifications 4.200.00 23,57% $990.02 $990.02 <br /> 4 earth work, per specifications <br /> a Mine 3 81,000.00 0.000/0 $0.00 $0M <br /> b intermediate Transfer Area 7,600.00 $0.00 $0.00 <br /> c Lower Bench Area 14,700.00 0,00% $0.00 $0.00 <br /> t <br /> 6 Surface Drainages (Furrows), <br /> per specifications <br /> a Mine 3 2,250.00 $0.00 $0.00 <br /> b Intermediate Transfer Area 200.00 $0,00 $0.00 <br /> c Lower Bench Area 600.00 $0,00 $0.00 <br /> d. <br /> Equipment Rental, <br /> per,specifications(if required) <br /> a Bulldozer 3,200.00 $0.00 $om <br /> b Backhoe Loader 800,00 $0,00 $D.00 <br /> 17 Revegetation, per <br /> specifications <br /> a Steeper than 3H:1 V 35,000.00 $0.00 $0.00 <br /> b Flatter than 31-1:IV 15,000,00 T. $0.00 $0.00 <br /> 8 Additional Surface Drainages, <br /> per specifications Of required) 1,050.00 $0.00 $0.00 <br /> 9 Additional Silt fence, <br /> (if required) 2400.00 per sPec7ifications $0.00 $0.00 <br /> TOTAL CONTRACT $188,200.00 SUBTOTAL $4,330.6 $4.330-02 TOTAL :1 <br /> i'o —d 0T99-112V2021 "-LSNOQ 31213aNI21 -%NOD <br />
The URL can be used to link to this page
Your browser does not support the video tag.