Laserfiche WebLink
Date- August 10, 1995 Attn- Jim McArdel <br /> Contractor: Gary Rinderle Construction, Inc. Project Name: Coal Basin/Mine 3 Reclamation Project <br /> Address: 542 33 Road Project#: PKA-5-359 <br /> Clifton, Colorado Location: Pitkin County, Redstone, CO <br /> 81520 Owner: State of Colorado, MLRD <br /> BID SCHEDULE <br /> PERCENTAGE COMPLETE INVOICE 1 <br /> BID BID PERCENT <br /> ITEM # DESCRIPTION AMOUNT COMPLETE SUB TOTAL TOTAL <br /> 1 Mobilization/Demobilization <br /> per specifications 10,000.00 66.60% $6,660.00 $6,660.00 <br /> 2 Demolition, per specifications 10,000.00 75.00% $7,500.00 $7,500.00 <br /> 3 Silt fence, per specifications 4,200.00 25.00% $1,050.00 $1,050.00 <br /> 4 Earth work, per specifications <br /> a Mine 3 81,000.00 25.00% $20,250.00 $20,250.00 <br /> b Intermediate Transfer Area 7,800.00 $0.00 $0.00 <br /> c Lower Bench Area 14,700.00 100.00% $14,700.00 $14,700.00 <br /> a <br /> r_05 Surface Drainages (Furrows), <br /> J w per specifications <br /> r__(9 <br /> '3 ad a Mine 3 2,250.00 $0.00 $0.00 <br /> U) <br /> ,1 ®Ir b Intermediate Transfer Area 200.00 $0.00 $0.00 <br /> w <br /> Z c Lower Bench Area 600.00 $0.00 $0.00 <br /> 6 Equipment Rental, <br /> per specifications (if required) <br /> a Bulldozer 3,200.00 $0.00 $0.00 <br /> b Backhoe Loader 800.00 $0.00 $0.00 <br /> 7 Revegetation, per <br /> specifications <br /> a Steeper than 3H:1 V 35,000.00 $0.00 $0.00 <br /> b Flatter than 3H:1 V 15,000.00 $0.00 $0.00 <br /> 8 Additional Surface Drainages, <br /> per specifications(if required) 1,050.00 $0.00 $0.00 <br /> 9 Additional Silt fence, <br /> per specifications(if required) 2,400.00 $0.00 $0.00 <br /> TOTAL CONTRACT $188,200.00 SUBTOTAL~ $60,160.00 $50,160 00 TOTAL <br /> TOTAL BILLED TO DATE $50.160.00 <br />