Laserfiche WebLink
GARY RINDERLE CONST. 13034346510 P. 04 <br /> I. ti Wli <br /> lilp,•,"z;. Dare: Novem"r 15, 1995 Attn: Jim MOArdel ! <br /> J I Contractor: Gary Rindede Construction, Inc. Project Name: Coal Basin!Mine 3 Reclamation Project <br /> Address: 542 33 Road Project# PKA-5y359 <br /> Clifton, Colorado L <br /> opation: Pitkirl idurity, Reds#one, CO <br /> 81520 Owner: ------�-- <br /> State of Colorado,MURD <br /> REVISED 11/15/95 BID SCHEDULE INV ICE #3 <br /> e!]= a PERCENTAGE COMPLETE <br /> I <br /> Bid <br /> BID PE"RCEN#' <br /> l M# DESCRIPTION AMOUNT COMPLETE SUB TOTAL TONAL <br />''�A" ,�• i Mobilization/Demobilization <br /> per specifications 10,000:00 33.40/o <br /> :r 2 Demolition, per specifications 10,000.00 0.00% $0.00 $0.00 'x <br /> 3 Slit fence, per specifications 4,200.00 g3.67% $990.02 .$890,02 <br /> 4 - 4 Earth work, per specifications <br /> , a Mine 3 81,000.00 0.00% $0.00 $0.00 � <br /> i, b Intermediate Transfer Area 7,800.00 $0.00 $0.00 <br /> c Lower Bench Area 14,700.00 0.00% 1 $0.00 S0.00 <br /> I�AC�idl4li s a , <br /> 5 Surface Drainages(Furrows), <br /> per specifications <br /> $0.00 $0.00 <br /> z y,;,',� a Mine 3 2,250.00 <br /> !A <br /> b Intermediate Transfer Area 200.00 $0.00 $0.00 <br /> .' c Lower Bench Area GO .00 $0-00 $0.00 <br /> b will i <br /> 6 Equipment Rental, <br /> per specifications(if required) <br /> 3,200.00 $0.00 ;$0.00 <br /> a Bulldozer - <br /> v <br /> b Backhoe Loader $00.00 $0.00 <br /> $0"00 <br /> J1 7 Revegeti tion, per - <br /> µ'' specifications <br /> a Steeper than 31-1:1 V 35 000.00 $0.00 $0.00 <br /> .Flatter than 3HA V 16,000.00 $0.00 $0.00 <br /> 8 Additional Surface Drainages, <br /> per specifications of required) 1,050.00 $0"00 $0.00 � <br /> 9 Additional Silt f• ���I er1Ce, <br /> K;I: n; per specifications(if aired) 2,400.00 1 $0.00 <br /> TOTAL CONTRACT $188,200.00 SUBTOTAL <br /> „ -$4,330.02' 54,330.02 TOTAL <br />