TASK 2 DEMOLITION <br /> There are two overall objectives of the demolition task. The first is to remove the corrugated <br /> metal mine entry structures and to demolish all concrete and block wall building remnants <br /> which remain at the Mine 4 entry and fan areas. The second is to push the rubble produced <br /> by the demolition process against the highwall remnant. <br /> Corrugated metal shrouding protects each of the entries at Mine 4 and the Mine 4 fan. The <br /> entries have been sealed with concrete block walls within each entry. The corrugated metal <br /> shrouding shall be removed at the point that they intersect with the face of the highwall or <br /> sloughed material. This shrouding shall be removed to the main facilities area for removal <br /> from the site by a third party. <br /> A number of previously-existing buildings located at the Mine 4 entry area have been <br /> demolished to the point that only the concrete floors and concrete and block wall portions of <br /> the buildings remain. CONTRACTOR will accomplish demolition of the remaining concrete and <br /> block wall building remnants, foundations, slabs and other such structures. The building and <br /> facility remnants generally consist of concrete walls, floors and foundations. Some of the <br /> buildings may be concrete block in composition. The building and facility remnants are <br /> generally reinforced with rebar. All of the walls, floors and foundations, to a depth of three <br /> feet below ground surface, must be demolished and removed to the base of the highwall. <br /> A number of concrete foundations, possibly reinforced with rebar, are present along the old <br /> conveyor corridor which extended from the Mine Bench down the face of the slope to the <br /> Lower Bench Area. These foundations shall be removed to three (3) feet below the ground <br /> surface during the demolition task. Rubble may be removed to either the Mine 4 or Lower <br /> Bench backfill areas, and placed against the highwall remnant for disposal. Any void spaces <br /> which remain at the entries between the cement block walls and the edge of the removed <br /> corrugated metal shrouding shall be filled with rubbleized debris. The corrugated metal <br /> shrouding must be completely filled from the concrete block walls to the outside edge of each, <br /> and from floor to roof. Care must be exercised to ensure that no damage to the concrete <br /> block walls occurs. <br /> All other rubble and assorted debris will be removed from the mine bench area, conveyor <br /> corridor and Lower Bench Area and placed at the base of the highwall so that no rubble or <br /> debris remain at these areas except at the base of the highwalls. <br /> The concrete and block wall materials and rubble shall be placed against the Mine 4 highwall <br /> and shall be evenly spread at the base of the highwall along its length. These materials will <br /> form the foundation for the backfill to be placed in Task 4 (Earth Work). All of the debris and <br /> rubble shall be covered by a minimum of four (4) feet of back fill material during Task 4 (Earth <br /> Work), portion of the project. <br /> 7 <br />