Laserfiche WebLink
JU_ 18 '95 03:52PM DIY/MINERALS&GEOLOGY P.2i4 <br /> } 'STATE-OF COLORADO <br /> f7 . * Labor and 1Naterial'Payment Bond <br /> PROJECT NO PKA-5-359 <br /> ' <br /> KNOW ALL MEN BY THESE PRESENTS: Bond #CF06-00172 <br /> That the Contractor <br /> Gary Rinderle ConstruC'tion, Inc. <br /> as Principal and hereinafter called"Principal," <br /> and <br /> Intercargo Insurance Company <br /> as Surety and hereinafter called "Surety," a corporation organized and existing under the laws of <br /> are held and firmly bound unto the STATE OF COLORADO acting by and through <br /> hereinafter called"Principal Representative,"and to all subcontractors and any others who have supplied or fur- <br /> nished or shall supply or furnish materials,rental machinery,tools,or equipment actually used in the performance <br /> of the hereinafter identified Contract,or who have performed or shall perform labor in the performance of or in con- <br /> nection with said Contract hereinafter called "Obligees" in the sum of <br /> One Hudnred Eighty Eight Thousand two Hund ar6&($no/ 100s ) <br /> 188 , 200 .00 <br /> together with interest at the rate of eight per cent(8%) per annum on all payments becoming due in accordance <br /> with said Contract,from the time such payments shall become due until such payment shall be made,for the pay- <br /> ment of which, well and truly made to the Obligees, the Principal and the Surety bind themselves, their heirs, <br /> executors, administrators, successors and assigns,jointly and severally, firmly, by these presents. <br /> WHEREAS,the Prindpal and the State of Colorado acting by and through the Principal Representative have entered <br /> Into a certaln Contract,hereinafter called"Contract,"dated 7/2 5 19 95 for <br /> the construction of a PROJECT described as <br /> Reclaimi, coal waste pile at Coal Basin Mine 3 <br /> which Contract Is hereby by reference made a part hereof, <br /> 39"1-874910 <br /> DeJ»FK (Over) <br />