Laserfiche WebLink
Coal Basin / Mine 3 Reclamation Project <br /> PKA-5-359 <br /> BID SCHEDULE <br /> Item Unit <br /> Description Qty. Unit Price Amount <br /> 00 <br /> 1 Mobilization/ 1 Job N/A $_/0 00 O <br /> Demobilization per <br /> specifications <br /> 00 <br /> 2 Demolition, per 1 Job N/A S 0000 <br /> specifications <br /> SO- <br /> 3 Silt fence, per 1,400 Ln. Ft. $ 3 $ 100 0-- <br /> specifications <br /> 4 Earth Work, per <br /> specifications <br /> od <br /> a Mine 3 1 Job N/A $ 9/ 000 <br /> b Intermediate 1 Job N/A $ 9koo co <br /> Transfer Area <br /> c Lower Bench Area 1 Job N/A $ 1)00 -e <br /> 5 Surface Drainages <br /> (Furrows), per <br /> specifications <br /> a Mine 3 2,250 Ln. Ft. $ / 00 $ ,Z 2 SO °o <br /> b Intermediate 200 Ln. Ft. $ / 9-0— $ 10 0 �- <br /> Transfer Area <br /> c Lower Bench Area 600 Ln. Ft. $ / 00_ $ 600 00 <br /> 6 Equipment Rental, <br /> per specifications <br /> (if required) <br /> a Bulldozer 40 Hours $te` $ 3200 00, <br /> b Backhoe Loader 20 Hours $ <br /> 4�6 <br /> �'- $ ?00 <br /> 7 Revegetation, per <br /> specifications <br /> a Steeper than 3H:1 V 10 Acres S00�— $3 — <br /> b Flatter than 3H:1 V 5 Acres $ 00 a'- $ 000 <br /> 8 Additional Surface 700 Ln. Ft. $_J 'so $ 10 FO 00 <br /> Drainages, per specs <br /> (if required) <br /> 9 Additional Silt fence, 800 Ln. Ft. $ ob 00 <br /> per specs <br /> (if required) <br /> GRAND TOTAL (Enter here and on Invitation and Bid Sheet) $ g 2Oo co <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />