GARY RINDERLE CONST. 13034346510 P. 02
<br /> dry;, Date: ! August 10, 1995 Attn: Jim McArdel
<br /> Contractor: Gary Rinderle Construction, Inc. Project Name: Coal Basin /Mine 3 Reclama -on Project
<br /> Address: 542 33 Road Project#: PKA-5-359
<br /> .'ram+: i �,•
<br /> 'h Cliftoh Colorado Location: Pitkin Co
<br /> un Redstone CO r
<br />` > 81520 Owner: State of Colorado, MLRD
<br /> BID SCHEDULE
<br /> PERCENTAGE COMPLETE 1N VDICF i.
<br /> 131D BID PERCENT .!
<br /> p I. ITEM # DESCRIPTION AMOUNT COMPLETE SUB TOTAL TOTAL II'
<br /> iiII1
<br /> 1 Mobilization/Demobilization , #,
<br /> per specifications 10,000.00 66.60% $6,660.00 $6 660.00 '.
<br /> 2 Demolition, per specifications 10,000.00 75,00% $7,500.00 $7,50,0.00 ;
<br /> Jy j 3 Silt fence, per specifications 4,200.00 25.00% $1,050.00 $1,050.00
<br /> !! 4 Earth work, per specifications '
<br /> a Mine 3 81,000.00 25.00% $20,250.00 $20,25P.00
<br /> t• .
<br /> + b Intermediate Transfer Area 7,800.00 $0.00 $0,00 `
<br /> c Lower Bench Area 14,700.00 100.00% $14 700.00 $14 700.00
<br /> 5 Surface Drainages (Furrows),
<br /> per specifications I
<br /> a Mine 3 2,250.00 $0.00 $F.00
<br /> b Intermediate Transfer Area 200.00 $0.00 $ .00 µ'
<br /> �'- c Lower,Bench Area 600.00 $0.00 $9.00
<br /> ;;;,•. 0 Equipment Rental, q.#
<br /> . per specifications (if required) is
<br /> AJ a Bulldozer 3,200.00 $0.00
<br />" b Backlioe Loader 800.00 $0.00 $ .00
<br /> x
<br /> ?• '. 7 Revegetation, per aj
<br /> specifications r4
<br /> ! a Steepor than 3H:1V 35,000.00 $0.00
<br /> b Flatter,than 3H:1V 15,000.00 $0,00
<br /> 8 Additional Surface Drainages, {°
<br /> per specifications (if required) 1,050.00 $0.00 $0.00
<br /> 9 Additignal Silt fence,
<br /> : C per specifications (if required) 2,400.00 $0.00 $0.00 ,
<br /> j TOTAL CONTRACT $188,200.00 SUBTOTAL $50,160.00 $50,160.00 TOTAL :