Laserfiche WebLink
Date: November 03, 1995 Attn: Jim McArdel <br /> Contfoctor: Gary Rinderle Construction, Inc. Project Name: Coal Basin/Mine 3 Reclamation Project <br /> .. - - . <br /> Address: 542 33 Road Project#: PKA-5-359 <br /> Clifton,Colorado Location: Pitkin County, Redstone, CO <br /> 81520 Owner: State of Colorado, MLRD <br /> BID SCHEDULE <br /> PERCENTAGE COMPLETE <br /> BID BID PERCENT <br /> ITEM# DESCRIPTION AMOUNT COMPLETE SUB TOTAL TOTAL <br /> 1 Mobilization/Demobilization <br /> per specifications 10,000.00 33.40% $3,340.00 $3,340.00 <br /> 2 Demolition, per specifications 10,000.00 0.00% $0.00 $0.00 <br /> 3 Silt fence, per specifications 4,200.00 51.93% $2,181.00 $2,181.00 <br /> 4 Earth work, per specifications <br /> a Mine 3 81,000.00 0.00% $0.00 $0.00 <br /> b Intermediate Transfer Area 7,800.00 $0.00 $0.00 <br /> c Lower Bench Area 14,700.00 0.00% $0.00 $0,00 <br /> 5 Surface Drainages(Furrows), <br /> per specifications <br /> a Mine 3 2,250.00 $0.00 $0.00 <br /> b Intermediate Transfer Area 200.00 $0.00 $0.00 <br /> c Lower Bench Area 600.00 $0.00 $0.00 <br /> 6 Equipment Rental, <br /> per specifications(if required) <br /> a Bulldozer 3,200.00 $0.00 $0.00 <br /> b Backhoe Loader 800.00 $0.00 $0.00 <br /> 7 Revegetation, per <br /> specifications <br /> a Steeper than 3H:1 V 35,000.00 $0.00 $0.00 <br /> b Flatter than 31-1:1 V 15,000.00 $0.00 $0.00 <br /> 8 Additional Surface Drainages, <br /> per specifications(if required) 1,050.00 $0.00 $0.00 <br /> 9 Additional Silt fence, <br /> per specifications(if required) 2,400.00 $0.00 $0.00 <br /> TOTAL CONTRACT $188,200.00 SUBTOTAL _ $5,521.00 _ $5,521.00 TOTAL <br />