My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-12-13_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1995-12-13_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2021 3:11:26 PM
Creation date
6/7/2012 3:08:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
12/13/1995
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4 -ADDITIONAL CONCRETE - FLUME <br /> In addition to the above described work, a two (2) inch thick layer of concrete may be poured <br /> over the entire surface of the concrete flume. The volume of concrete necessary is estimated <br /> at 38 cubic yards of additional concrete. Concrete shall be 3,000 PSI, and may either be <br /> delivered or mixed on site. Concrete mixture ratios shall be delivered to the PROJECT <br /> MANAGER. The surface must be thoroughly cleaned, and a bonding agent applied prior to <br /> pouring the concrete. Due to anticipated cold weather conditions, CONTRACTOR shall supply <br /> and install insulation blankets. <br /> WORK SEQUENCE <br /> Work is anticipated to proceed as follows: <br /> - Demolition of concrete headwalls which anchor the steel culvert; <br /> - Removal of steel culvert from the flume; <br /> - Diversion of Dutch Creek into a pipe or other suitable channel within the confines <br /> of the Dutch Creek Flume; <br /> - Anchor rebar to floor of flume; <br /> - Pour concrete within flume; <br /> - Remove temporary diversion channel from flume. <br /> EQUIPMENT <br /> The following equipment is needed to complete the work: <br /> Tracked loader or dozer with minimum 6 ft. blade width (snow removal) <br /> Boom truck or Crane (steel culvert removal) <br /> - Caterpillar 416B backhoe\loader or 74 fhp equivalent (rock removal) <br /> PROJECT SCHEDULE <br /> The project is to begin on October 9, 1995, and is scheduled for completion in eight (8) working <br /> days. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.