Laserfiche WebLink
OCT-04-1995 14:49 FROM 1970961 970 963 2390 TO 13038328106 P.02 <br /> SEP 26 195 12s42PM DIV/MIMZgL.S&6E0L0GY P.6/7 <br /> r <br /> Coat Basin/Dutch Creek Flume Maintenance <br /> C-81-017• <br /> • PKA-6-1004 <br /> 8t0 SCHEDULE <br /> hem T&aaripficn city. unk Unit prW* Amount <br /> 1 Removal of Steel Culvert, 1 Job N/A <br /> including Concrete <br /> Demolition per <br /> specifications <br /> 2 Installation of rebar and 16 1 Job N/A e 6 60 <br /> cubic yards of concrete, <br /> Per specifications <br /> 3 Additional concrete 14 Cubic <br /> Yards <br /> TOTAL <br /> 4 Additive Alternate: Provide, 38 Cubic $y00 gl�a — <br /> pour and finish 38 cubic Yards <br /> Yards of concrete per <br /> specif cadons <br /> Contractor / /H (Q. / � <br /> f-aliz Te r <br /> Signature Phone 0 - y 0 S 00 <br /> Tex lO No. g L Z 90 /Z <br /> Address <br /> 5 <br /> TnTAL P.02 <br />