Laserfiche WebLink
Change Order Expenses, Snow Removal Bid, Coal Basin <br />Machine <br />850 Dozer <br />Job Hrs. $ /Hr. Total $ <br />Diversion 5 100 500 <br />Snow Rmvl. 17 100 1,700 <br />416 Loader Barriers 2 107.5 215 <br />Barriers 8 70 560 <br />Flume 1.5 70 105 <br />Sump 6.5 70 455 <br />690 Loader Barriers 9 80 720 <br />Flume, stdby 47 28 1,316 <br />Flume, wrkng 53.5 80 4,280 <br />Barrier Rental 1,860 <br />TOTAL 11,711 <br />