My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (302)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (302)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 7:13:14 AM
Creation date
6/7/2012 10:02:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Permit File
Doc Date
12/1/1987
Doc Name
Final Permit Wastewater Discharge
Section_Exhibit Name
Chapter VII Volume 9 Section III-G
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br /> Page 4 of 16 <br /> Permit No..CO-0039136 <br /> A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS (continued) <br /> 2. Monitoring Requirements <br /> In order to obtain an indication of the probable compliance or non- <br /> compliance with the effluent limitations specified in Part I , the <br /> permittee shall monitor all effluent parameters at the following <br /> required frequencies . <br /> Effluent Parameter Measurement Freauency c/d/ Samole Type e/ <br /> Instantaneous <br /> Flow (MGO) Weekly or Continuous <br /> Total Suspended Solids Monthly Grab <br /> (mg/1 ) <br /> Total Iron (mg/1) Monthly Grab <br /> Oil and Grease (mg/1 ) Weekly Visual or Grab <br /> pH (s.u.) - Weekly Grab <br /> Salinity f/ Quarterly Grab <br /> Self-monitoring samples taken in compliance with the monitoring <br /> requirements specified above shall be taken at: 001 , the outfall of the <br /> sediment pond as -shown in figure 2 page 16. <br /> c/ Monitoring is required only during periods of discharge. If <br /> "no discharge" occurs, this shall be reported at the specified <br /> frequency. (See Part B. ) <br /> d/ Should a discharge occur due to snowmelt or a rainfall event, <br /> sampling of all parameters shall be done as a minimum at the <br /> beginning and at the end of the discharge. The permittee shall <br /> indicate on the monitoring report when the discharge is caused <br /> by this snowmelt or rainfall event. <br /> e/ See definitions, Part B. <br /> f/ Salinity shall be measured as Total Dissolved Solids (TDS) or elec- <br /> trical conductivity where a satisfactory correlation with TDS has <br /> been established based on a minimum of five (5) samples. Samples <br /> shall be taken at the permitted discharge point. <br /> 1/81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.