Laserfiche WebLink
Table VI-H-1 <br /> Post-Mine Reclamation Schedule <br /> Mining is expected to continue until after 2020. <br /> On final cessation of mining, the following schedule for reclamation will be followed. <br /> Prior to this time, the operater will seek any necessary permission for alternative use <br /> requirements which may be necessary to implement postmining plans, which call for <br /> development of the winter recreational potential of the area. <br /> FINAL RECLAMATION: <br /> Due to the severe winter conditions in Coal Basin a full working season is only about six <br /> months long (May - October). It will probably require two or more seasons to complete <br /> the reclamation work following mine closure. The planned schedule will be: <br /> — First season (Summer 6 months). Reclaim Nos. 1, <br /> 3, 4 and 5 portal areas <br /> — Second season (Summer 6 months). Reclaim tunnel <br /> and preparation plant areas, all roads not associated <br /> with postmining land uses and the Carbondale train <br /> loadout <br /> — Third season (Summer 6 months). Additional work, as <br /> necessary <br /> The major steps are: <br /> Removal of Structures <br /> Sealing of Portals <br /> Backfilling and Grading <br /> Topsoil Replacement <br /> Revegetation <br /> POSTMINING USE <br /> Cross-country and snowcat-served skiing could begin after active mining ceases, and <br /> would constitute an additional wintertime usage, complimentary to the wildlife and <br /> grazing uses of the non-snow seasons. <br /> Downhill lift-served skiing would require more planning, permission from the U.S.F.S., <br /> and construction activity, and would take place over a longer time period. <br /> 37 <br />