Laserfiche WebLink
TABLE VI-D-5 <br /> DISTURBED AREAS TO BE RETAINED FOR <br /> RECLAMATION/RECREATIONAL USE <br /> Disturbed/Permit Use Size <br /> Area (s) <br /> Entrance road - Redstone Main access to base 4 . 5 miles <br /> to prep . plant area area site. <br /> Prep . plant area -- Base area site 110 acres <br /> Tunnel area Secondary base area 54 acres <br /> and overflow parking <br /> lot . <br /> Powerline to tunnel area Power for 2nd base and 1 . 1 miles <br /> overflow parking area <br /> Road from prep plant Access to secondary 1 . 1 miles <br /> area to tunnel area base area & overflow <br /> (Prob . need to widen parking lot/lift <br /> road) <br /> No . 4 mine pad * Upper lift terminal 8 . 4 Acres <br /> for (one or two) <br /> lift (s) serving runs <br /> from No . 4 mine down <br /> to Bear Creek. Possible <br /> restaurant facility . <br /> Road from tunnel area Access for lift/ 3 . 4 miles <br /> to No. 4 mine restaurant service <br /> Powerline to No . 4 mine Electricity for lift/ 2 . 1 miles <br /> restaurant <br /> Road - No . 4 mine to Access - Upper lifts 1 . 9 miles <br /> top of Huntsman Ridge and Lee Creek Basin <br /> (Area C) <br /> No. 3 mine road - Tunnel Lift construction on 2 . 1 miles <br /> to "Hump" the northeast side , <br /> access to the "Hump" <br /> lifts . <br /> No . 3 to No . 5 Mine Access to lifts and 3 . 8 miles <br /> facilities <br /> No . 5 mine pad* Alternate cross country 11 acres <br /> ski center/summer <br /> recreation center <br /> Powerline to No . 5 Power Source for summer 3 . 7 miles <br /> mine portal rec . cross-country <br /> center <br /> Mine buildings may be used as ski facilities . <br /> _or_ <br />