My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-10-22_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1993-10-22_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2021 11:16:24 AM
Creation date
6/5/2012 11:56:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
10/22/1993
Doc Name
Technical Concerns and Proposed Commitments.
From
Sunnyside Gold Corp
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Commitments for TR-14, Permit No. M-77-378, which details <br /> a plan to install bulkhead seals within the underground workings in <br /> order to return hydrologic balance to approximate pre-mining <br /> condition. <br /> BY: ACS <br /> DATE: 10/18/93 <br /> COMMITMENT #1 <br /> THE OPERATOR UNDERSTANDS THAT ANY NEW SEEPS OR ANY CHANGES IN WATER <br /> QUALITY OR QUANTITY ISSUING FROM KNOWN SEEPS IN THE AREA OF THE <br /> SUNNYSIDE MINE, FOLLOWING THE INSTALLATION OF BULKHEAD SEALS IN THE <br /> UNDERGROUND WORKINGS, ARE REGARDED BY THE WATER QUALITY CONTROL <br /> _ _ _REVISION TO BE UNPERMITTED POINT SOURCE DISCHARGES. 9:""' TIT- - 1 <br /> .............. ::...; <br /> ES t Y. 13 �2�,� � �''' ' ' .OEMT6;:;.13�33�> VC� '_ �iCx�` <br /> WITH BTU. ' 'H "' `� R . E1TaITY:..CE "�AcEa vrrG <br /> Q :. ..:.. >::i> <br /> THE O RATOR ` UT2THER tJNb RSTANn THAT ANY d" I'c'I4NA1IT MANGE �N <br /> WATER QUALITY OR QUANTITY IN THE SEEPS OR THE DRAINAGES SURROUNDING <br /> THE MINE, i.e. , CHANGES REPORTED BY THE OPERATOR IN CONJUNCTION <br /> WITH COMPLIANCE WITH THE APPROVED HYDROLOGIC MONITORING PLAN OR <br /> CHANGES REVEALED THROUGH DIVISION INSPECTIONS OF THE MINE, WILL BE <br /> CONSIDERED BY THE DIVISION AS POSSIBLE EVIDENCE OF THE DEVELOPMENT <br /> OF UNPERMITTED POINT SOURCE DISCHARGES RELATED TO THE INSTALLATION <br /> OF THE BULKHEADS. THEREFORE, SIGNIFICANT CHANGES IN WATER QUALITY <br /> OR QUANTITY IN THE SEEPS OR IN THE DRAINAGES SURROUNDING THE MINE, <br /> FOLLOWING THE INSTALLATION OF BULKHEAD SEALS IN THE UNDERGROUND <br /> WORKINGS, WILL BE CITED AS A POTENTIAL COMPLIANCE PROBLEM BY THE <br /> DIVISION AND THE OPERATOR WILL BE REQUIRED BY THE DIVISION TO <br /> CONTACT THE WATER QUALITY CONTROL DIVISION TO DETERMINE IF A NEW <br /> DISCHARGE PERMIT FOR THE MINE OR A MODIFICATION OF THE EXISTING <br /> DISCHARGE PERMIT FOR THE MINE IS NECESSARY. <br /> ENFORCE14ENT'OF.POTENTIAL 'ICI9CHARGE PERMIT COMP1,1ANC V!gO LE M.:- IL <br /> :... .........:... <br /> REST WITH M 'WATER QUALITY CONTROL DIVISION. <br /> COMMITMENT #2 <br /> THE OPERATOR WILL CREATE A SEPARATE SECTION IN EACH ANNUAL <br /> RECLAMATION REPORT THAT WILL INCLUDE DATA AND NARRATIVE TO <br /> DISSEMINATE INFORMATION FROM THE MONITORING PROGRAM REQUIRED BY THE <br /> TERMS OF TR-14 . THE OPERATOR WILL NOTIFY THE DIVISION IMMEDIATELY <br /> IN THE CASE THAT TRACER IS DETECTED AT ANY POINT BY THE MONITORING <br /> PROGRAM, OR IF THERE IS INCREASED DISCHARGE TO ANY <br /> SURROUNDING DRAINAGE THAT MAY BE RELATED TO FLOODING OF THE <br /> SUNNYSIDE WORKINGS. <br /> COMMITMENT #3 <br /> THE OPERATOR WILL PROVIDE THE DIVISION WITH A DETAILED SUMMARY OF <br /> THE COSTS THAT WOULD BE INCURRED BY THE STATE TO INSTALL <br /> REPLACEMENT BULKHEADS IN THE EVENT OF PERMIT REVOCATION AND BOND <br /> FORFEITURE. A BOND, IN AN AMOUNT APPROVED BY THE DIVISION, MUST BE <br /> IN PLACE FOR BULKHEAD REPLACEMENT PRIOR TO CLOSING THE AMERICAN <br /> TUNNEL VALVE. <br /> COMMITMENT #4 <br /> THE OPERATOR WILL PROVIDE THE DIVISION WITH A PLAN TO CHARACTERIZE <br /> CONJUNCTIVE FLOW WITHIN THE CEMENT CREEK DRAINAGE IN THE VICINITY <br /> OF THE SUNNYSIDE MINE WITHIN 30 DAYS OF REVISION APPROVAL. <br />
The URL can be used to link to this page
Your browser does not support the video tag.