Responses to Division Concerns <br /> Page 8 <br /> The mine pool will be inoculated with bromide by spraying a <br /> bromide solution on accessible ribs (walls) , backs (ceiling) <br /> etc. This will be done after installation of the Terry Tunnel <br /> bulkhead but before removal of the Main Level Hoist (for <br /> access to the different levels) and installation of the <br /> American Tunnel bulkhead . The total amount of sodium bromide <br /> to be sprayed throughout the mine will be 12, 560 lbs as <br /> calculated by Simon Hydro-Search - Work Plan to Perform a <br /> Tracer Test (Table 1) or this amount of bromide equivalent <br /> weight if another compound is used. The distribution by <br /> elevation presented in Table 1 will be followed as close as <br /> access will allow but from a practical sense the elevations <br /> below 11, 800 feet will receive most of this amount. This will <br /> result in an average concentration of bromide in the mine pool <br /> of 1 ppm as it is introduced to the water with the rise of the <br /> mine pool . <br /> As a result of spraying, some bromide will enter the American <br /> Tunnel flow during the period after spraying but before valve <br /> closure. This concentration will be monitored after valve <br /> closure to see that it is decreasing. <br /> Because of the added confidence of finding water that has <br /> passed through the Sunnyside Mine by the proposed use of <br /> bromide as a tracer , SGC submits the following program for <br /> consideration. <br /> - Perform one more series of seep, spring and adit flow <br /> documentation studies during the 1994 field season to <br /> provide additional background data at located sites, <br /> delete sites or add sites for future reference. <br /> It will not matter if the American Tunnel valve has been <br /> closed given the distance to surface and the probable <br /> flow rate. Any new flows found could not be affected by <br /> groundwater flows to surface in the few months that the <br /> valve could be closed without a direct connection. This <br /> would be readily apparent by the pressure gauge readings <br /> and bromide analysis. Analysis at located sites will be <br /> for dissolved iron, manganese, lead , copper , zinc, <br /> cadmium and bromide in addition to field parameters. <br /> Basic water chemistry analysis will be included for new <br /> sites found. <br /> Monthly samples of Cement Creek are taken above the mine <br /> site (CC-1) for the Mined Land Reclamation Permit. <br /> Bromide will be added to the analysis list . If a level <br /> of 10-20 GPM leakage is assumed, leakage could be <br /> detected at this site (using a 1 ppm bromide <br /> concentration) eight months of the year based on 1992 <br /> flow data. If bromide is detected it will be tracked <br /> upstream to the source. <br />