Laserfiche WebLink
Responses to Division Concerns <br /> Page 2 <br /> Table 1 provides a comparison of actual footages <br /> (referenced from AT-P3) to the "track repair footages" <br /> referenced in the Simon Hydro-Search report (February 11 , <br /> 1992) . AT-P3 will be used as the origin (distance = 0 ' ) <br /> for all future footage references in the American Tunnel. <br /> b) Flow from the Sunnyside Mine in comparison to flow from <br /> the American Tunnel portal . <br /> The flow that originates on SGC property (Sunnyside Mine) <br /> as compared to the total flow from the American Tunnel <br /> portal has been monitored periodically since March, 1992. <br /> Flow measurements were taken from Parshall flumes <br /> installed at convenient locations close to the property <br /> line and outside the portal . Using a straight arithmetic <br /> average or a time weighted average, 66 - 67% of the <br /> American Tunnel flow originates from the Sunnyside Mine <br /> (SGC property) and would be impounded by the proposed <br /> bulkhead. <br /> c) Proposed bulkhead site in relationship to Sunnyside Mine <br /> workings. <br /> SGC has not developed underground workings (ie rock <br /> excavations) outbye of the proposed bulkhead site. The <br /> 0700 runaround and its flow contribution is inbye the <br /> proposed bulkhead site with only undeveloped tunnel being <br /> downstream of the proposed bulkhead. The reference point <br /> discussion in Part 1 a) and Table 1 explain the reason <br /> for confusion as to the location of the 0700 runaround in <br /> relationship to the bulkhead site (See Figure 1 , page <br /> 15) . <br /> TABLE 1 <br /> AMERICAN TUNNEL - DISTANCE REFERENCE CONVERSION (Feet) : <br /> Simon Hydro-Search <br /> (February 11 , 1992) <br /> "Track Repair Footage " AT-P3 = 0 Comments <br /> 8150 10080 <br /> 7350 9145 <br /> - 8157 property line <br /> 8127 flume <br /> - 7950 bulkhead site <br /> 6400 7852 <br /> 3420 3976 <br /> 2700 3226 <br /> 2400 2941 <br /> 0 - ' <br /> This site is in the concrete ditch between the portal and <br /> reagent feed building. <br />