Laserfiche WebLink
I• <br />Criteria: 25 yr- 24 hr Storm Event = 3.4" <br />Minimal Run -off into Pond <br />Peak Mine Water Flow into Pond = 4000GPM = 8.9 cfs <br />Spillway Capacity > Mine Water Inflow + 25 yr 24 hr Storm Event <br />POND 001 — EMERGENCY SPILLWAY DESIGN <br />For Open Channel Flow <br />Q= <br />Where: Q = Flow <br />C m = Constant = 1.49 (English Units) <br />A, = Area Dedicated to Mine Water Inflow <br />R = Area/Wetted Perimeter <br />S = Channel Bottom Out Slope <br />• <br />• <br />N = Manning's Roughness Factor = 0.29 for Gravel <br />A, _ [8.6(48 +2(3.4)) + (8.6)(8.6)] / 144 Al = 3.79 F? <br />R = 3.79/ [48 + 6.8 + 2(2(8.6) / 12] R = 0.68 <br />Q = [( 1.49) / 0.029] (3.79) (0.68) (0.1) Q = 35.1 cfs <br />C A, R 3 S 12 (Modified Manning's Equation) <br />N <br />Safety Factor = 35.1 cfs / 8.9 cfs SF = 3.9 <br />TR -49 <br />2.05 -16c <br />2/14/07 <br />