Laserfiche WebLink
This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and /or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1981 - 018 Date: 5 / 31 / 2012 <br />Permittee: Blue Mountain Energy, Inc. <br />Street: <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />3607 CR 65 <br />Cit Rangely <br />State: C O Zip Code: 81648 <br />Brief Description of Revision: <br />facilities. <br />Public Notice Attached: Yes No I (Required for PRs and TRs) <br />Bond Increase: Yes No ✓ Federal ✓ Non - Federal Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed ( + / -) <br />Permit ( + / -) <br />Affected ( + / -) _ <br />Mineral Ownership - <br />Mineral Private ( + / -) _ _ _ _Acres <br />Mineral Federal ( + / -) _ _ _ _ Acres <br />0 0 Acres <br />- • <br />0 0 Acres <br />0 0 Acres <br />- • <br />As -built details for the B -Seam dewatering <br />RECEIVED <br />JUN p 9019 <br />Division of rceeiamation, <br />Mining and Safety <br />Surface Ownership - <br />Private Land ( + / -) _ _ _ _ Acres <br />Federal Land ( + / -) _ _ _ _ Acres <br />State Land ( +/ -) _ _ _ _ Acres <br />Mineral State ( + / -) _ _ _ _ Acres <br />