Laserfiche WebLink
IrrID <br />? <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />JUN 0 ?01? <br />Urvi J u , n�ciamation' COAL EXPLORATION 180 -DAY REPORT- ' Keciamation, <br />Mining <br />and Safety Mining and Safety <br />Prospector: Bowie Resources LLC Notice of Intent No.: CX- 2005 - 217 -10 <br />Address: P.O. Box 483 Project Name: Spruce Stomp Exploration Plan <br />Paonia, CO 81428 County: Delta <br />Date: May 23, 2011 <br />This report is filed in accordance with Rule 2.02.6(3)(a) of the Regulations of the Colorado <br />Mined Land Reclamation Board for Coal Mining, adopted in accordance with the Colorado <br />Surface Coal Mining Act, C.R.S. 34 -33 -101 et seq. The purpose of this report is to update <br />the Division on exploration and reclamation activities that have occurred in the past 180 days <br />of active prospecting. The report also indicates any changes in operations from what was <br />stated in the original Notice of Intent sent to the Division. The Operator may use this form, <br />modify this form, or use a different format altogether. <br />1. Attach a map that shows: <br />a) Which proposed holes have been drilled at the date, <br />b) Any actual or proposed relocations of holes, <br />c) The extent of all significant road construction completed to date (exclude <br />minor blade work), and <br />d) Current location of all drill rigs and test equipment. <br />2. Describe what and where reclamation activities have occurred in the past 180 <br />days. Mention sealing and plugging, regrading, retopsoiling and reseeding <br />activities. (Attach additional pages, if needed.) <br />The road to SS -9 was constructed and reclaimed by regrading, placing topsoil and seeding. The drill pad for <br />SS -9 was constructed and reclaimed by regrading, placing topsoil and seeding. Drill hole SS -9 was sealed. <br />DH- 2010 -1 was drilled and completed as a monitoring well. The road to DH- 2010 -1 was left open for access <br />to the monitoring well. Drill rigs and test equipment have been demobilized. <br />