My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-09-07_REVISION - M1977378
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
2000-09-07_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 7:42:40 AM
Creation date
6/5/2012 6:36:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
9/7/2000
Doc Name
Adequancy Issues
From
Sunnyside Gold Corp
To
DMG
Type & Sequence
TR22
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adequacy Issues <br />Page 2 <br />2. Pipe bypass system and thrust rings. <br />Since the bypass pipe is to be grouted as soon as the concrete reaches the <br />bulkhead design strength, thrust is not a concern but SGC had planned to place 12 <br />gauge seep collars along the pipe. A 3/8" thrust ring will be added. It will be <br />placed 5' or more from the downstream face to distribute any loading that may <br />exist to the ribs. <br />As with the Terry Tunnel bulkhead the 3/8" thrust ring would provide a factor of <br />safety of 18 -20 if the pipe was not grouted and the Terry Tunnel design head was <br />realized. The maximum head for this bulkhead is lower. <br />Please advise me if this letter does not address the adequacy concerns to the satisfaction <br />of DMG assuring approval of TR -22. <br />cc: Allen Sorenson, DMG <br />Sincerely, <br />Larry Perino <br />Reclamation Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.