My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-08-25_REVISION - M1977378 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
2000-08-25_REVISION - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2021 7:17:37 PM
Creation date
6/5/2012 6:36:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
8/25/2000
Doc Name
Submittal
From
Sunnyside Gold Corp
To
DMG
Type & Sequence
TR22
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR -22 Submittal <br />Page 3 <br />MONITORING <br />SGC does not propose any additional monitoring. Current MLR Permit monitoring at <br />EC -1 and EC -34 will be sufficient to detect any major changes to water quality and with <br />the current quality of the water to be impounded behind the bulkhead, there is little risk <br />that this project will disturb the hydrological balance. <br />BONDING <br />All installations are to be left as permanent structures upon final reclamation and no <br />additional land within the MLR Permit area will be disturbed. Therefore, additional <br />reclamation costs will not be incurred for final reclamation. The existing bond amount <br />contains approximately $253,000 for replacement of the Terry Tunnel bulkhead. Upon <br />completion of this project, there will be in place an additional bulkhead precluding any <br />future need for replacement of the existing Terry Tunnel bulkhead. Therefore, additional <br />bonding should not be needed. Sunnyside may request a bond reduction at a later date to <br />reflect the final closure and reclamation of the Terry Tunnel site. <br />SGC believes this project will allow progress towards final reclamation of the Sunnyside <br />Mine and would like to complete it and reclamation of the surface disturbance at the <br />Terry Tunnel before weather conditions prevent further work at the site during 2000. <br />Therefore, if any additional information or clarification is needed for your consideration <br />of this TR submittal, please contact me. A check for $188 is included with this submittal <br />for the TR application fee. <br />cc: Allen Sorenson, DMG <br />S incerely, <br />Larry Perino <br />Reclamation Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.