My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-08-25_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
2000-08-25_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2021 8:57:33 PM
Creation date
6/5/2012 6:36:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
8/25/2000
Doc Name
Response
From
John F. Abel, Jr.
To
Sunnyside Gold Corp
Type & Sequence
TR22
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Terry Tunnel Bulkhead #2 Page 3 August 17, 2000 <br /> 2, 256 feet of essentially dry roof and walls immediately <br /> downstream from the bulkhead. The water head behind the existing <br /> Terry Tunnel bulkhead appears to have stabilized at approximately <br /> 92 feet (40 psi) , much less than the 650 feet (282 psi pressure <br /> head) it was designed to resist from the Sunnyside Mine pool or <br /> the very conservative 469-foot design head (203 psi) for the near <br /> portal Terry Tunnel bulkhead. Given existing hydraulic conditions <br /> in the Sunnyside Mine water impounded behind the new bulkhead <br /> could reverse the pressure on the existing Terry Tunnel bulkhead <br /> and apply 377 feet of hydraulic head (163 psi pressure head) to <br /> its downstream face. The existing Terry Tunnel bulkhead is <br /> capable of resisting a reverse head. <br /> The near portal Terry Tunnel bulkhead is potentially subject <br /> to the force from the maximum credible 0 . 087 ft/sec2 earthquake <br /> acceleration of the 3500 feet line of sight water impounded <br /> between the two Terry Tunnel bulkheads . This is a significant <br /> potential load, but the design calculations in Appendix A <br /> demonstrate that earthquake acceleration does not control bulkhead <br /> design. <br /> The bulkhead design; 7-foot thick, #10 deep-beam flexural <br /> rebar on 6-inch centers at the downstream face, 3 . 5-inch minimum <br /> concrete cover between the #10 rebar and the downstream form face, <br /> #6 temperature and shrinkage bars on 12-inch centers at the <br /> upstream face, 3-inch minimum concrete cover between the #6 rebar <br /> and the upstream form face and 3, 000 psi concrete; meets all <br /> design requirements, as shown in the Appendix A calculation <br /> sheets . Pipe and inspection cut-outs in the downstream rebar cage <br /> will require 5-foot long, 450 angled, #6 corner trim bars, as shown <br /> on Figure 2, page 24 of the March 10, 1993 "Bulkhead Design for <br /> the Sunnyside Mine" report to eliminate any possibility of <br /> concrete corner cracking when the bulkhead is fully loaded. After <br /> the walls are scaled, the rock wall surfaces should be either <br /> parallel to the tunnel axis or tapered. Irregularities along the <br /> scaled rock wall should equal or exceed 0 . 15-inch in order to <br /> fully mobilize the design concrete shear strength. Eight percent <br /> (4, 200 in2) of the 51, 800 in of the tunnel perimeter along the <br /> 7-foot long bulkhead is required as latite irregularities <br /> projecting at least 0 . 15 inches into the tunnel to assure that the <br /> design concrete shear strength is achieved at the 203 psi design <br /> pressure head. <br /> Sincerely,)W, , Q j �. <br /> John F. Abel, Jr. <br /> Colorado P.E. 5642 <br />
The URL can be used to link to this page
Your browser does not support the video tag.