My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-10-02_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
2000-10-02_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 2:17:37 PM
Creation date
6/5/2012 6:36:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
10/2/2000
Doc Name
Submittal
From
Sunnyside Gold Corp
To
DMG
Type & Sequence
TR23
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR-23 <br /> Page 2 <br /> impounded water. The water that will be impounded by the outside Terry bulkhead has a <br /> current SO4 concentration of approximately 600 ppm which is in the positive attack <br /> category (attached Bureau of Reclamation tables)which would only require Type II <br /> cement. Type II Cement + Class F flyash can be specified, according to the Bureau of <br /> Reclamation Table II for exposure conditions into the very severe category. SGC does <br /> not believe the requested mix modification in this TR proposal will have any measurable <br /> effect on the longevity of the bulkhead under the exposure conditions anticipated. <br /> Proposed Mix Design: <br /> #/cu. <br /> Portland Type II 720 <br /> Coarse Aggregate (5/8") 1673 <br /> Fine Aggregate 1004 <br /> Fly Ash, Class F 115 <br /> Water 324 <br /> Delay Set (4-6 hours) <br /> The flyash is 14% by weight of the cementitious material. This is in the normal to low <br /> category for specification of flyash quantity. Additional flyash would require a reduction <br /> in cement and was not changed. <br /> SGC does not propose any change to the design strength to be achieved to satisfy the <br /> bulkhead design parameters. Design strength was specified at 3000 psi. <br /> Please let me know at your earliest convenience whether this submittal addresses any <br /> concerns that DMG may have regarding this submittal. <br /> Sincerely, <br /> Larry Perino <br /> Reclamation Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.