My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-01_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2012-06-01_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:59:02 PM
Creation date
6/4/2012 10:08:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
6/1/2012
Doc Name
Adequacy Letter and cost estimate
From
DRMS
To
New Elk Coal Company, LLC
Type & Sequence
TR64
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Re -grade Containment No. 3 <br />Site: New Elk Mine Permit Action: TR64 Permit /Job #: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado Abbreviation: None <br />Date: 5/21/2012 County: Las Animas Filename: Regrade <br />Contaimnent <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi - Universal <br />Attaclunent. <br />NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Total unit Cost/Hour: $199.86 <br />Total Fleet Cost/Hour: $199.86 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,500 <br />Swell factor: 1.000 <br />Loose volume: 1,500 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />100 feet <br />852.6 LCY/hr <br />Consolidated stockpile 1.0 <br />7,400 feet <br />2.550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$58.56 <br />NA <br />Operating Cost/Hour: <br />$102.81 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $199.86 <br />Total Fleet Cost/Hour: $199.86 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,500 <br />Swell factor: 1.000 <br />Loose volume: 1,500 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />100 feet <br />852.6 LCY/hr <br />Consolidated stockpile 1.0 <br />7,400 feet <br />2.550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.