Laserfiche WebLink
SUNNYSIDE GOLD CORP. A-72 A-68 <br /> LATITUDE LATITUDE <br /> WATER SAMPLE ANALYSIS 37-47-25 37.48-40 <br /> LONGITUDE LONGITUDE <br /> SITE:ANIMAS RIVER STATIONS A-72,A48 107-40-01 10739-31 <br /> ELEVATION ELEVATION <br /> 9200 9320 <br /> ------------------------------------------------------ ---------------- - <br /> Parameter->in unds of mg/l unless noted + + + + + + + + + <br /> CFS C SU umho mg/l mg/l mg/l mg/l mgA mg/l mg/l mg/l mgA <br /> CALCULATED <br /> Sample Ste Sample Date Sample Time Sampled By lab Q ds FieldT FieldpH FieldCond dAl dCd dCu dPb dZn dFe dMn SULFATE HARDNESS <br /> A-72 05-Aug-98 09.15,00 GN IML 291 9 6.01 250 <.05 <.001 <.01 <005 0.29 059 0.68 122 150 <br /> A--72 05-Aug-98 09:15 00 GN ACZ 291 9 6.01 250 a100 <.003 <01 <04 0.29 045 0.54 205 129 <br /> A-72 09-Sep-98 09:00:00 GN IML 187 9 628 340 008 <.001 <.01 <.005 0.30 073 0.74 188 185 <br /> A-72 09-Sep-98 09:00:00 GN ACZ 187 9 628 340 0.03 <003 <01 <.04 0.33 075 0.75 160 183 <br /> A-72 07-Oct-98 10:30,00 GN IML 113 7 682 350 014 <.001 <.01 <.005 043 1.79 1 16 202 205 <br /> A-72 07-Oct-98 10-30 00 GN ACZ 113 7 682 350 <.03 <.003 <01 <.04 0.37 1 33 0.83 190 179 <br /> A-72 10-Nov-98 12:30.00 GN IML 129 4 640 380 <.05 <.001 <.01 <005 0.565 2.31 1.22 231 243 <br /> A-72 1 O-Nov-98 1230,00 GN ACZ 129 4 640 380 0.07 <.003 <.01 <.04 049 2.26 1 20 200 213 <br /> A-72 02-Dec-98 10:15:00 GN IML 95 3 6.01 410 0.23 <.004 002 <005 0.60 2.11 1.57 234 174 <br /> A-72 02-Der-98 10 15 00 GN ACZ 95 3 6.01 410 0.26 <.003 0.02 <.04 054 1.87 1.31 210 230 <br /> A-72 06-Jan-99 11-00,00 GN IML <100 4 536 460 0.80 0.001 0.02 <.005 0.74 336 261 304 301 <br /> A-72 06Jan-99 11:00 00 GN ACZ <100 4 536 460 0.55 0.004 0.03 <.04 0.71 129 1.74 280 312 <br /> A-72 04-Feb-99 10-05:00 GN IML <100 0 5.33 480 0.85 0.001 <.01 <005 0.64 355 2.14 381 393 <br /> A-72 04-Feb-99 100500 GN ACZ <100 0 533 480 081 <.003 <.01 <04 0.66 3.04 1 75 300 324 <br /> A-72 03-Mar-99 10:30.00 GN-LP IML 64 2 545 520 0.56 0.002 <005 <.005 071 231 2.05 319 269 <br /> A-72 03-Mar-99 1030 00 GN-LP ACZ 64 2 545 520 0.72 <.003 002 <.04 072 2.31 1.85 270 310 <br /> A-72 07-Apr-99 11:00.00 GN-LP IML 97 5 6.23 420 018 0.015 0 014 <005 0 586 2.88 1.37 240 226 <br /> A-72 07-Apr-99 11:00 00 GN-LP ACZ 97 5 623 420 0.16 <.003 0.01 <04 0.58 3.06 1.37 220 234 <br /> A-72 06-May-99 11-00.00 GN IML 125 6 618 420 0.16 0.002 0 015 <.005 0.995 2.49 203 219 228 <br /> A-72 06-May-99 11-00.00 GN ACZ 125 6 6.18 420 015 0 005 <01 <.04 1.03 2.70 2.13 210 229 <br /> A-72 09-Jun-99 10:20 00 GN IML 1090 7 6.56 110 0.10 <.001 0.011 <.005 022 028 0.26 41 60 <br /> A-72 09-Jun-99 10:20:00 GN ACZ 1090 7 6.56 110 <.03 <003 <01 <.04 020 0.16 023 40 54 <br /> A-72 07-Jul-99 10.00,00 GN IML 757 12 585 110 014 <.001 <.001 <005 019 034 0.26 42 60 <br /> A-72 07-Jul-99 10:00 00 GN ACZ 757 12 5.85 110 <03 <.003 <.01 <04 0.17 002 026 50 62 <br /> A-72 04-Aug-99 09:40 00 GN IML 584 10 6.95 170 <.05 <.001 <.001 <005 024 018 0.38 62 85 <br /> A-72 04-Aug-99 09:40 00 GN ACZ 584 10 695 170 003 0 005 <01 <04 0.23 017 0.38 70 85 <br />