My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-10-18_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1999-10-18_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2021 1:28:18 AM
Creation date
6/4/2012 7:10:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
10/18/1999
Doc Name
Response
From
Sunnyside Gold Corp
To
DMG
Type & Sequence
TR14
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IIIIIIIIIIIIIIIIIII <br /> 999 <br /> St1NICYSIDE GOL13 CORPORATION e+}' '()fi rAine alt&Geoiocgy <br /> AN ECH0 DAY COMPANY <br /> P.O. Box 177 • Silverton, CO 81433 <br /> Phone (970) 387-5533 • Fax (970) 387-5310 <br /> September 16, 1999 <br /> Ms. Sarah Johnson <br /> CDPHE —Assessment Unit <br /> Water Quality Control Division <br /> 4300 Cherry Creek Drive South <br /> Mail Code; WQCD-AU-B2 <br /> RE: August 1999 Monthly Report and DMRs for CDPS Permit No. CO-0044768 —Mine <br /> Remediation Projects, San Juan County <br /> Dear Ms. Johnson: <br /> The following is submitted to satisfy the August 1999 Monthly and DMR reporting <br /> requirements for CDPS Permit No. CO-0044768 —Mine Remediation Projects and the <br /> related Consent Decree agreement. <br /> Project Status: <br /> "A List" Projects <br /> • American Tunnel Mine Waste Dump <br /> • Boulder Creek Tailings Project <br /> • Surface Mill Tailings at Eureka <br /> • Gold Prince—Mill Tailings <br /> • Ransom Tunnel <br /> • Longfellow—Koehler Mine Waste Project <br /> • Pride of the West Tailings <br /> These projects were completed and accepted by DMG as complying with the Consent <br /> Decree work plans and MLR Standards in 1997. Monitoring and maintenance is the only <br /> additional work planned for these sites. <br /> Confirmation of completion by CDPHE has been received for two of these projects— <br /> Surface Mill Tailings at Eureka and Ransom Tunnel. Sunnyside has not received <br /> confirmation of completion from CDPHE for the remaining five projects although <br />
The URL can be used to link to this page
Your browser does not support the video tag.