Laserfiche WebLink
COMMITMENT #1 <br />THE OPERATOR UNDERSTANDS THAT ANY NEW SEEPS OR ANY CHANGES IN WATER <br />QUALITY OR QUANTITY ISSUING FROM KNOWN SEEPS IN THE AREA OF THE <br />SUNNYSIDE MINE, FOLLOWING THE INSTALLATION OF BULKHEAD SEALS IN THE <br />UNDERGROUND WORKINGS, ARE REGARDED BY THE WATER QUALITY CONTROL <br />DIVISION TO BE UNPERMITTED POINT SOURCE DISCHARGES. THE DIVISION <br />OF MINERALS AND GEOLOGY UNDERSTANDS THAT THE OPERATOR DOES NOT <br />AGREE WITH THIS INTERPRETATION BY THE WATER QUALITY CONTROL <br />DIVISION. THE OPERATOR FURTHER UNDERSTANDS THAT ANY MEASURABLE <br />CHANGE IN WATER QUALITY OR QUANTITY IN THE SEEPS OR THE DRAINAGES <br />SURROUNDING THE MINE, i.e. CHANGES REPORTED BY THE OPERATOR IN <br />CONJUNCTION WITH COMPLIANCE WITH THE APPROVED HYDROLOGIC MONITORING <br />PLAN OR CHANGES REVEALED THRU DIVISION INSPECTIONS OF THE MINE, <br />WILL BE CONSIDERED BY THE DIVISION AS POSSIBLE EVIDENCE OF TIIE <br />DEVELOPMENT OF UNPERMITTED POINT SOURCE DISCHARGES RELATED TO THE <br />INSTALLATION OF TIIE BULKHEADS. THEREFORE., SIGNIFICANT CHANGES IN <br />WATER QUALITY OR QUANTITY IN THI': SEEPS OR IN THE DRAINAGES <br />SURROUNDING THE MINE, FOLLOWING THE INSTALLATION OF BULKHEAD SEALS <br />IN THE UNDERGROUND WORKINGS, WILL BE CITED AS A POTENTIAL <br />COMPLIANCE PROBLEM BY THE DIVISION AND THE OPERATOR WILL BE <br />REQUIRED BY THE DIVISION TO CONTACT THE WATER QUALITY CONTROL <br />DIVISION TO DETERMINE IF A NEW DISCHARGE PERMIT FOR THE MINE OR A <br />MODIFICATION OF THE EXISTING DISCHARGE PERMIT FOR THE MINE IS <br />NECESSARY. RESPONSIBILITY FOR ENFORCEMENT OF POTENTIAL DISCHARGE <br />PERMIT COMPLIANCE PROBLEMS WILL REST WITH TIIE WATER QUALITY CONTROL <br />DIVISION. <br />COMMITMENT #2 <br />THE OPERATOR WILL. CREATE A SI':PARAI'I•: SECTION IN EACH ANNUAL <br />RECLAMATION REPORT 'THAT WILL INCLUDE DATA AND NARRATIVE TO <br />DISSEMINATE; 1NFORMATION FROM THE MONITORING PROGRAM REQUIRED BY THE <br />TERMS OF TR -14. THE OPERATOR WILL NO'T'IFY THE DIVISION IMMEDIATELY <br />IN THE CASE THAT TRACER IS DETECTED A'I' ANY POINT BY THI; MONITORING <br />PROGRAM, OR IF TH1• ;RI; IS INCREASED DISCHARGE TO ANY SURROUNDING <br />DRAINAGE THAT MAY BE RELATED TO FLOODING OF THE SUNNYSIDE WORKINGS. <br />COMMITMENT' #3 <br />' 1 ' 1 1 1 : OPERATOR W I L L PFOV I I ) I • : THE D 1 V 1 :;ION WITH A DETAILED SUMMARY OF <br />1'i1f; COSTS THAT WOULD BE INCURRED I{Y THE STATE; TO INSTALI, <br />REPLACEMENT BULKHEAD ; IN '1'111: EVENT OF PERMIT REVOCATION AND BOND <br />FORFEITURE. A BOND IN AN AMOUNT APPROVED BY THE DIVISION, MUST BE <br />IN PLACE FOR B[11.KHI' :AD REPLACEMENT PRIOR TO CLOSING THE AMERICAN <br />TUNNEL VALVE. <br />COMM I TMENTJ 4 <br />THE OPERATOR WILL PROVIDE TIII: DIVISION WI'I'H A PLAN TO CHARAC'I'E;RIZE <br />CONJUNCTIVE FLOW WIT'IIIN THE CEMENT CREEK DRAINAGE IN THE VICINITY <br />OF 'T11I•; SUNNYSIDE MINE WITHIN 30 DAYS OF REVISION APPROVAL. <br />1 <br />