My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-06-08_REPORT - M1977378 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
2001-06-08_REPORT - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2021 4:20:40 PM
Creation date
6/1/2012 11:00:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
6/8/2001
Doc Name
MLR Annual Report
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Annual Update <br />Sunnyside Mine Bulkheads <br />Page 4 <br />Mine Pool: <br />The American Tunnel bulkhead valve was closed in September 1996 and the Terry <br />Tunnel bulkhead valve was closed in July 1996. Since September 1996 the mine pool <br />has been allowed to rise towards physical equilibrium. As of the end of the report year <br />(March 30, 2001), the mine pool had reached approximately 11,661 feet MSL. The <br />rate of rise of the mine pool leveled off in November of 1999 and during the 2000 <br />report year Sunnyside submitted monitoring data to DMG with the conclusion that <br />physical equilibrium had been reached (DMG agreed) thereby starting the waiting <br />period for final closure of the American Tunnel. <br />Since physical equilibrium had occurred and further alkaline injection would not occur <br />through the Terry Tunnel, Sunnyside submitted technical details to DMG for an <br />additional near - surface bulkhead to be placed in the Terry Tunnel. This bulkhead's <br />purpose was to stop flows to surface through the tunnel from seeps entering the Terry <br />Tunnel downstream of the existing bulkhead. The submittal was approved and <br />implemented during the 2000 report year. The Terry Tunnel surface disturbance was <br />reclaimed during the report year although some finish work may need to be done <br />during the 2001 report year. <br />Included in Appendix B is monitoring data and a graph of the mine pool pressure <br />readings through March 2001. <br />Study Update: <br />Attached in Appendix B is the data collected through March 2000 for the seep, spring, <br />and flowing adit inventory and monitoring required by TR -14. <br />During the report year no new monitoring sites were added and no sites were deleted. <br />Sunnyside visited all identified sites twice during the report year, collected field data, <br />and sampled for lab analysis more than the 20 percent of the sites the monitoring <br />program (attached in Appendix B) requires. Data summary sheets are included in <br />Appendix B. <br />
The URL can be used to link to this page
Your browser does not support the video tag.