Laserfiche WebLink
SUNNYS DE GOLD CORP. <br /> SILVE RTON,COLO. <br /> SEEP POINT LOCATION <br /> ELEVATION <br /> -1 <br /> DRAINAGE E V <br /> 11�IL �EEP NO. <br /> EC-34 S.Fork Animas Stream 37,52,48 10�1 3 8-0 <br /> 37-,5-2---,32- _ib _:�4 b <br /> CC-1- Cement Stream 8:-'4'2 1%36__ <br /> Cement— ----Seep 37153126 107,39,00 -10,52-0------ <br /> ATS2 S. Fork Cement Seep 37,53,20 107,38,26 19,520 <br /> S-1 S. Fork Cement ig 53,13 1073852 10,560 <br /> Sjpdn_ <br /> MIDWAY I Eureka Adit 38,33,30 107,35,1 b 1 10,720- <br /> S-14 S. Fork Cement Spring 37,53,05 107,38,41 10,720 <br /> S-6 Cement Seep 37,53,47 107,38,43 10,760 <br /> S-7 Cement i Seep 37,53,47 107,38,43 1 10,760 <br /> S-8 Cement Seep 37,53,47 107,38,43 j 10,760 <br /> S-20 Eureka Spring 38,37 00 1 07.35,28 10,800 <br /> S-15 S.Fork-Cement Seep 37,52,50 107,38,41 10,840 <br /> RB-1 Cement Adit 37,53,50 107,38,35 10,96-0-------- <br /> SILkIRLEDGE S. Fork Cement Adft-- 37,52136 107,38,39 10,960 <br /> Cement-- - sp_ring 37,54,24 107,38,31 11 <br /> t ,080 <br /> --- <br /> Cement Sp(ing ____ 37,54,23 107,38,28 -i""5o <br /> MS-2- Cement...... Spring 37,54,26 107,38,28 11,180 <br /> 1 Cement <br /> MS-1 Cement Spring37,54,30 107,38,26 11,200 <br /> S--9 ----Cement Add- 37_,54,28 _107,38,20 11,320---- <br /> GOLD KING N. Fork Cement Adit 37,53,43 107,38,18 11,400 <br /> CG-1 15 California Gulch --Stream- <br /> PiG--ff� ---------- Placer Gulch Stream 37,55,50 107,35-,64 11,420 <br /> -M--j -----Cement----- Adit 3-7—,54,37 -1 U-138-114 11,440 <br /> S-4 Cement_ Adit 37,54,32 107,38,14 11,440 <br /> TT-1 Eureka Seep _37,53,33 107,36,10 11,480 <br /> TT-2 Eureka _Seep 37153,33 107,36,07 11,480 <br /> S-13 Cement Ad it 37,54,34 107,38,12 11,520 ---- <br /> LC-2 S. Fork Cement Spring 37,53,17 107,38,11 11,560 <br /> MH-2&3 S. Fork Cement -Spring 37,53,15 107,38,12 11,560 <br /> BH S. Fork Cement Ada 37'52'5 6 107,38,05 11,600 <br /> S-17 Eureka Sprang _37,53,31 107,36,16 11,640-- <br /> TOLTEC-1 Eureka Seep 37,54,00 107,36,13 11,640 <br /> LC-1 S.--Fork Cement Spring 37,53,14 --107,38,05 11,680-- <br /> M-2 Cement Adit 37,54,38 107,37,51 11,720 <br /> M-3 Cement Adit 37,54,36 107,37,48­1­111740 <br /> LC S-.-Fork cemen- ----- - -107,37,5 3 <br /> t Spring 53125 11,800 <br /> S-18 Eureka Add 37,531-35--tL-1107,36,23 11,920 <br />