Laserfiche WebLink
COMMITMENT #1 <br /> THE OPERATOR UNDERSTANDS THAT ANY NEW SEEPS OR ANY CHANGES IN WATER <br /> QUALITY OR QUANTITY ISSUING FROM KNOWN SEEPS IN THE AREA OF THE <br /> SUNNYSIDE MINE, FOLLOWING THE INSTALLATION OF BULKHEAD SEALS IN THE <br /> UNDERGROUND WORKINGS, ARE REGARDED BY THE WATER QUALITY CONTROL <br /> DIVISION TO BE UNPERMITTED POINT SOURCE DISCHARGES. THE DIVISION <br /> OF MINERALS AND GEOLOGY UNDERSTANDS THAT THE OPERATOR DOES NOT <br /> AGREE WITH THIS INTERPRETATION BY THE WATER QUALITY CONTROL <br /> DIVISION. THE OPERATOR FURTHER UNDERSTANDS THAT ANY MEASURABLE <br /> CHANGE IN WATER QUALITY OR QUANTITY IN THE SEEPS OR THE DRAINAGES <br /> SURROUNDING THE MINE, i .e. CHANGES REPORTED BY THE OPERATOR IN <br /> CONJUNCTION WITH COMPLIANCE WITH THE APPROVED HYDROLOGIC MONITORING <br /> PLAN OR CHANGES REVEALED THRU DIVISION INSPECTIONS OF THE MINE, <br /> WILL BE CONSIDERED BY THE DIVISION AS POSSIBLE EVIDENCE OF THE <br /> DEVELOPMENT OF UNPERMITTED POINT SOURCE DISCHARGES RELATED TO THE <br /> INSTALLATION OF THE BULKHEADS. THEREFORE, SIGNIFICANT CHANGES IN <br /> WATER QUALITY OR QUANTITY IN THE SEEPS OR IN THE DRAINAGES <br /> SURROUNDING THE MINE, FOLLOWING THE INSTALLATION OF BULKHEAD SEALS <br /> IN THE UNDERGROUND WORKINGS, WILL BE CITED AS A POTENTIAL <br /> COMPLIANCE PROBLEM BY THE DIVISION AND THE OPERATOR WILL BE <br /> REQUIRED BY THE DIVISION TO CONTACT THE WATER QUALITY CONTROL <br /> DIVISION TO DETERMINE IF A NEW DISCHARGE PERMIT FOR TIIE MINE OR A <br /> MODIFICATION OF THE EXISTING DISCHARGE PERMIT FOR THE MINE IS <br /> NECESSARY. RESPONSIBILITY FOR ENFORCEMENT OF POTENTIAL DISCHARGE <br /> PERMIT COMPLIANCE PROBLEMS WILL REST WITH THE WATER QUALITY CONTROL <br /> DIVISION. <br /> COMMITMENT #2 <br /> THE OPERATOR WILL CREATE A SEPARATE SECTION IN EACH ANNUAL <br /> RECLAMATION REPORT THAT WILL INCLUDE•' DATA AND NARRATIVE TO <br /> DISSEMINATE INFORMATION FROM THE MONITORING PROGRAM REQUIRED BY THE <br /> TERMS OF TR-14 . THE OPERATOR WILL NOTIFY THE DIVISION IMMEDIATELY <br /> IN THE CAST? THAT TRACER IS DETECTED AT ANY POINT BY THE MONITORING <br /> PROGRAM, OR IF THERE IS INCREASED DISCHARGE TO ANY SURROUNDING <br /> DRAINAGE THAT MAY BE RELATED TO FLOODING OF THE SUNNYSIDE WORKINGS . <br /> COMMITMENT#_3 <br /> THE OPERATOR WILL PROVIDE THE DIVISION WITH A DETAILED SUM14ARY OF <br /> THE COSTS THAT WOULD BE INCURRED BY THE STATE TO INSTALL <br /> REPLACEMENT BULKHEADS IN THE EVENT OF PERMIT REVOCATION AND BOND <br /> FORFEITURE. A BOND IN AN AMOUNT APPROVED BY THE DIVISION, MUST BE <br /> IN PLACE FOR BULKHEAD REPLACEMENT PRIOR TO CLOSING THE AMERICAN <br /> TUNNEL VALVE. <br /> COMMITMENT #4 <br /> THE OPERATOR WILL PROVIDE THE DIVISION WITH A PLAN TO CHARACTERIZE <br /> CONJUNCTIVE FLOW WITHIN THE CEMENT CREEK DRAINAGE IN THE VICINITY <br /> OF THE SUNNYSIDE MINE WITHIN 30 DAYS OF REVISION APPROVAL. <br /> Ii-1 <br />