Laserfiche WebLink
Site Reclamation Activity <br /> April 1999-March 2000 <br /> Table A <br /> Acreage Disturbed and Reclaimed by Site <br /> Site Total Acreage Total Added Total Acreage <br /> Permit Disturbed Acreage Acreage Under in Reclamation <br /> Area 1999 Disturbed Reclamation Phase <br /> 1999 <br /> AMERICAN TUNNEL 22.05 0 17.06 0.00 6.93 <br /> TERRY TUNNEL 7.12 0 4.30 0.00 1.65 <br /> SUNNYSIDE BASIN 66.50 0 49.50 0..00 48.76 <br /> TAILINGS POND #4 49.90 0 46.48 0.00 25.54 <br /> TAILINGS POND #3 9.09 0 7.71 0.00 7.71 <br /> TAILINGS PONDS #1 &#2 65.38 0 56.11 0.00 56.11 <br /> ENGINEERING OFFICE 18.00 0 18.00 0.00 16.30 <br /> SETTLING PONDS <br /> MAYFLOWER MILL 5.61 0 5.61 0.00 5.61 <br /> TOTAL 243.65 0 204.77 0.00 168.61 <br /> Notes: 1) Tailings Pond #4 includes roads and borrow areas <br /> 2) Engineering Office Site includes all areas south of Hwy 110 <br /> Page 2 <br />