Laserfiche WebLink
Reclamation activity during the 1991 reporting year (April 1991 to <br />March 1992) consisted of site cleanup, tailing pond consolidation <br />and tailings pond slope stabilization. Table A (page 2 ) <br />summarizes acreage disturbed and reclaimed by area during the 1991 <br />reporting year. <br />In the following sections of this report, each area is addressed, <br />covering environmental activity at the site during the 1991 <br />reporting year and planned environmental activity at each site for <br />the 1992 reporting year. <br />AMERICAN TUNNEL PORTAL AREA - Plate No. 1 <br />During the 1991 reporting year, no additional acreage was <br />disturbed. Reclamation work consisted of general site cleanup and <br />hauling of the old Lead Carbonate Tailings Pond to Tailings Pond <br />No. 1 at the Mayflower Mill as approved in TR -11. <br />The discharge water from the mine portal was treated throughout the <br />reporting year as required by the CDPS Permit. Biomonitoring <br />toxicity to Ceriodaphnia is still a problem and testing is ongoing <br />to determine the actual cause of toxicity. A possibility exists <br />that basic water chemistry play a role in the experienced toxicity <br />and testing is in progress to quantify what portion of the toxicity <br />is due to basic water chemistry. A course of action to deal with <br />the toxicity will be developed after the cause is determined. <br />Activities planned for 1992 are: <br />1) Annual site cleanup. <br />2) Continue working on the biomonitoring toxicity issue. <br />3) Plant vegetation on the site of the old Lead Carbonate <br />Tailings Pond. <br />TERRY TUNNEL AREA - Plate No. 2 <br />During the 1991 reporting year, no additional acreage was disturbed <br />and no acreage was reclaimed. Activity at the site consisted of <br />general site cleanup and operation of the water treatment plant <br />from the 1st week of June 1991 to mid - October, 1991 as required by <br />the CDPS Permit. The water treatment settling ponds were cleaned <br />with the sludge being hauled to the Mayflower Mill Tailings Pond <br />No. 3. <br />Activities planned for 1992 are: <br />SITE RECLAMATION ACTIVITY <br />APRIL 1991 TO MARCH 1992 <br />1) Annual site cleanup. <br />2) Operation of the water treatment plant as required for <br />treatment of the portal discharge CDPS Permit. <br />