My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-06-08_REPORT - M1977378 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
1990-06-08_REPORT - M1977378 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2021 2:56:53 PM
Creation date
6/1/2012 10:59:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
6/8/1990
Doc Name
Annual Fee/Report/Map
From
Sunnyside Gold Corp
To
MLRD
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATh OF COLORADO <br /> MINED LAND RECLAMATION DIVISION L� of �010 <br /> Department of Natural Resources Y` �9 <br /> Fed'4,r_;�s io <br /> 1313 Sherman St., Room 215 N <br /> Denver,CO 80203 '�187 ' <br /> 303 866-3567 *�87e* _ <br /> FAX 303 832-8106 <br /> Roy Romer, <br /> Governo, <br /> ✓ Fred R Banta. <br /> � � n <br /> Division Director <br /> March 29, 1990 <br /> Sunnyside Gold Corp. <br /> P. 0. Box 177; 1303 Snowden <br /> Silverton, CO 81433 <br /> 112 Annual Fee Letter <br /> In order to maintain your mining operation in compliance with the law, the annual <br /> fees, report, and map required by C.R.S. 34-32-116(3) and (4) must be submitted <br /> annually on or before your permit anniversary date. Fees are based upon a <br /> schedule o your operation is an open mining operation and $275 for any <br /> other operation. Division records indicate you owe $350.00. <br /> el Permit No. : M-77-378 <br /> Operation Name: Sunnyside Mine <br /> Anniversary Date: 06/10/90 <br /> Annual Fees for the Year(s) : 1990 <br /> Total : $350.00 (Due on your Anniversary Date) <br /> IF YOUR ANNUAL FEES, ANNUAL REPORT, AND MAP ARE NOT RECEIVED ON OR BEFORE YOUR <br /> ANNIVERSARY DATE, A CIVIL PENALTY IN THE AMOUNT EQUAL TO YOUR ANNUAL FEE AMOUNT <br /> WILL BE AUTOMATICALLY ASSESSED AND WILL BE DUE AND PAYABLE WITHIN THIRTY (30) DAYS <br /> FROM YOUR ANNIVERSARY DATE. <br /> If your records indicate different facts than those stated above, please inform <br /> this office as soon as possible, otherwise, we will expect to receive the annual <br /> fee, the enclosed Notice of Intent to Continue Mining Operations (your annual <br /> report), and your map, as required by the statute, on or before your anniversary <br /> date. If you cannot include these materials with the-fee, p ease indicate on the <br /> enclosed annual report form how soon we should expect to receive these materials. <br /> as required by the statute on or before your anniversary date. <br /> To bring the Division up-to-date as to the reclamation on the site, please include <br /> in your annual report, and map the following information: <br /> Your map should be to a scale of not less than 100' to the inch and not more than <br /> 660' to the inch, it should indicate the phases of the reclamation plan which have <br /> been completed and correlated with the timetable as required. Your report and map <br /> shall contain the following information: <br /> 1 ) Location and number of acres affected during that year; <br /> 2) locations and number of acres reclaimed for that year; <br />
The URL can be used to link to this page
Your browser does not support the video tag.