Laserfiche WebLink
7. Approved page 2.05 -15 discusses the fuel storage area and oil storage area. This information <br />was not identified or is not included in the proposed TR4. Please discuss if the fuel and oil <br />storage areas are proposed to be relocated or removed through proposed TR4. <br />a. The fuel storage area will remain as described on the approved page 2.05 -15. It has <br />been added back into the proposed TR04. <br />8. Proposed revised pages 2.05 -21 and 2.05 -24 discuss the access road E -2. Proposed Road E -2 <br />was not identified on either Map 2.05 M1A or 2.05 M1 B. Please revise the appropriate maps <br />to delineate the location of proposed Access Road E -2. <br />a. Road E -2 does not exist and has been removed from the text. <br />9. Proposed revised Map 2.05.3 M1A delineates a small access road east from Road C ending at <br />the PECOCO Pond embankment. This proposed road is not labeled on Map 2.05 M1A nor is <br />information of this proposed road identified in the proposed revised text. Please provide the <br />appropriate information concerning this access road in accordance to Rule 4.03.2. <br />a. Map 2.05 MIA has been revised to include the short road ending at the PECOCO Pond <br />embankment. In addition, text has been added and Map 2.05 M1A has been revised to <br />include information on the powder magazine and its location. <br />10. Proposed revised page 2.05 -22 states that coal haulage will occur on Roads A/B /B -1. It appears <br />that haulage will occur on Haul Roads A/B /A -1. Please revise to appropriate text to identify <br />the correct coal haulage locations. <br />a. The text has been revised to identify the correct coal haulage road locations. <br />11. Proposed revised page 2.05 -22 speaks to a 150 degree turn on Haulroad D. According to Map <br />2.05.3 M1A, this description is based on the previously approved information associated with <br />Haulroad D. Please revise the text on page 2.05 -22 to reflect the appropriate information <br />and design of Haulroad D. <br />a. The text has been revised to reflect the appropriate information and design of Haulroad D. <br />12. Proposed revised page 2.05 -24 lists Road C -1 as an access road. It appears that this should be <br />identified as Road C. Please revise to identify the correct Access Road label. <br />a. The text has been revised that identifies Road C as an access road. <br />13. Approved Map 2.05.3 M3 identifies Access and Haul Road Profiles. Based on the proposed <br />access and haulroad revisions identified in the TR4 application, Map 2.05.3 M3 will need to be <br />revised. Please provide a revised Map 2.05.3 M3 to delineate the proposed revised access <br />and haulroad profiles identified in the TR4 application according to Rules 4.03.1 and <br />4.03.2. <br />a. Haul roads have not yet been completed to their final specifications. As- builts for the haul <br />roads will provided as soon as construction is complete <br />