My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-08_PERMIT FILE - C2009087A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087A
>
2012-05-08_PERMIT FILE - C2009087A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:28 PM
Creation date
5/31/2012 1:47:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087A
IBM Index Class Name
Permit File
Doc Date
5/8/2012
Doc Name
Permit Area
Section_Exhibit Name
2.05.3 Operation Plan - Permit Area
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The right to use or lease said premises• or any part thereof at any time for any purpose, including <br />the right to explore and prospect said premises for minerals other than coal. The use and leasing <br />of said premises shall be for purposes other than and not inconsistent with the rights and privileges <br />herein specifically granted. Notwithstanding the foregoing, any subsequent agreement affecting the <br />Leased Premises, and, the rights therein granted shall be- subordinate to this Lease and the • rights <br />herein granted to Lessee: <br />C.' t ; ::The -'right to'. dispose of or -•lease the surface above, the •Leased Premises. Any subsequent • lease or <br />disposal of the surface above the Leased Premises' shall be expressly subject to the terms of this <br />-Lease. <br />D. The right at all times during the life of this Lease to go upon said premises 'and every part thereof <br />for the purpose of inspecting same, and the books of accounts and records of mineral workings <br />therein, and of ascertaining whether or not said Lessee and those holding thereunder by and from <br />it, are carrying out the terms, covenants and agreements in this Lease contained. - <br />E. The 'right -at anytime -to- grant a right =bf ='way upon; over or across m11 or any part"of iEhe Leased <br />Premises' for airy ditch, reservoir, railroad, communication system, electric powerline, pipeline, <br />schoolhouse or other lawful purpose. Such &ants shall'be subordinate to the rights-of Lessee, <br />including the right to subside'the surface of the premises; and shall provide that any and all damages <br />caused to any structures or improvements placed upon the surface of the premises subsequent to the <br />' date hereof shall-be'repaired by and at the expense of the party'to whom the easement or right -of- <br />way was 'granted. If the grant of such rights shall' unteasonably interfere with Lessee's rights <br />hereunder, the implementation or'effectivetiess of the grant'of such rights shall be delayed until such <br />time as there is no interference with Lessee's rights. <br />TO HAVE AND TO HOLD-The above- described'premises unto` msee its heifs; successors; assigns,.oi <br />legal'•representatives' for the term' of•20•`yea'rs, and -until Twelve O'clock: noon-.on -the' at day of Decenibei'; <br />2016, and, in accordance with`Sectiori 5 -hereof.( "the Primary Tern'•): acid Us -long -thereafter As coal is being <br />produced from the Leased Premises and the royalties, and rentals'pr6dded fo'r-hefeitn.are- being paid, or by any <br />extension hereof ( "the Extended Term "), subject to the fdllowing terms; conditions and agreements, -to-wit: <br />1. ADVANCE bUN N ROYALTY — As minimum and advance royalty, without relation to the amount <br />of coal mined from the Leased Premises, Lessee shall pay annually in advance to Lessor the following <br />amounts: <br />LEASE YEAR <br />1996 <br />1997 <br />1998 <br />- 1999• <br />2000 ' <br />2001 <br />2002- <br />2003 <br />i 2004 i <br />" %'•: 2005 <br />'2006•• <br />. •AMR <br />$14:000 .' <br />$14.000 <br />$14.000 • <br />$14.000 <br />$14.000 <br />$14.000 <br />,$14.000 <br />$14.000 <br />:$14:000.': L, <br />$14:000 ' <br />r.•.. .$28.000 •.:;,•;: . <br />tMUM I`7 <br />2007' <br />• -2008 <br />2009 <br />12010 <br />2011, <br />2012 <br />2013 <br />2014 <br />. '•2015• <br />•2016 <br />.AMR <br />$28.000 <br />$28.000 <br />$28,000- <br />$28.000 <br />$28.000 <br />$28.000 <br />$28.000 <br />$28,060 <br />000. <br />428,000- <br />Royalty due for coal produced from the Leased Premises shall be credited against (i) any advance minimum <br />royalty payment. under this Lease, and (ii) any unrecouped advance minimum royalty payments under: any <br />Page 2 of 10 �1 <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.