My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-01-25_HYDROLOGY - M1977378 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1999-01-25_HYDROLOGY - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 12:32:58 PM
Creation date
5/31/2012 8:54:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
1/25/1999
Doc Name
4th Qtr. 1998 Rpt
From
Sunnyside Gold Corp
To
CDPHE-WQCD
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4th Quarter/December 1998 Monthly Report <br /> Page 2 <br /> ♦ Sunnyside Mine Pool Mitigation - Alkaline solution Injection <br /> This project was not active in December or the 4tn quarter <br /> of 1998. The water pool pH, at the American Tunnel <br /> bulkhead, was 4. 08 and the bulkhead pressure was 368 psi <br /> at month and quarter end. <br /> Sunnyside will continue to monitor these parameters. <br /> "B List" Projects <br /> ♦ Columbus Mine Portals -Mine Waste Dumps <br /> ♦ London Mine Portals - Waste Dumps <br /> Work, permitting or arrangement for access is not planned <br /> until it becomes evident that the work plans for these <br /> projects require implementation. <br /> ♦ Mayflower Facility - Upland Hydrological Control <br /> Sunnyside has obtained an access agreement (copy attached) <br /> for all planned work not on land owned or controlled by <br /> Sunnyside. With this access agreement and Sunnyside's land <br /> ownership over the rest of the land area involved, <br /> Sunnyside has legal right-of-entry to implement the work <br /> plan for this project. A Technical Revision to Sunnyside's <br /> MLR permit (M-77-378) has been submitted and approved by <br /> DMG for all planned work within the MLR permit boundary. <br /> A Stormwater Permit Certification (COR-040054)Modification <br /> has been submitted and accepted that expands the <br /> stormwater permit area to include the project area. <br /> There was no activity on this Project in December due to <br /> snow-cover. During the 4t quarter, the drainage <br /> interception structure and lined ditch for drainage c were <br /> completed and the lined ditch for drainages a and b was <br /> started. <br /> Snow-cover stopped progress on this project and progress <br /> pictures were not taken due to the snow-cover. <br /> Work will resume on this project in the spring. <br />
The URL can be used to link to this page
Your browser does not support the video tag.