My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-04-19_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1999-04-19_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2021 10:04:49 AM
Creation date
5/31/2012 8:53:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
4/19/1999
Doc Name
1st Qtr 1999 Rpt
From
Sunnyside Gold Corp
To
EPA
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r � III I II I II I II IIII III <br /> 999 <br /> SUNNYSIDE GOLD CORPORATION <br /> AN ECUO DAY COMPANY <br /> (; IVED P.O. Box 177 - siiverton, CO 81433 <br /> Phone (970) 387-5533 - Fax (970) 387-5310 <br /> APB �- � 1999 <br /> Ml(lerats Geoiog ` / �7 o <br /> 7 <br /> April 16, 1999 <br /> Attention: Ron Zdyb <br /> Mail Code: 8D2-W-GW <br /> U. S. Environmental Protection Agency <br /> Underground Injection Control (UIC) <br /> 999 18t` Street, Suite 500 <br /> Denver, Colorado 80202-2466 <br /> RE: EPA File No. C05000-03745, San Juan County, Colorado <br /> 1st Quarter 1999 Report (January —March) <br /> _ 11Dear Mr. Zdyb: <br /> In accordance with the quarterly reporting requirements of EPA's June 26, <br /> 1996 Rule Authorization letter for injection of water and alkaline material <br /> into the Sunnyside Mine, Sunnyside Gold Corporation (SGC) submits the <br /> following report. This report covers the period from January 1, 1999 <br /> through March 31, 1999. <br /> Terry Tunnel Bulkhead <br /> The Terry Tunnel bulkhead was inaccessible during the 1" quarter and no <br /> inspections or sampling occurred. The mine pool elevation remained below <br /> 11,600'elevation based on pressure monitoring at the lower American <br /> Tunnel bulkhead. Therefore, the bulkhead pressure should be 8 psi. <br />
The URL can be used to link to this page
Your browser does not support the video tag.