Laserfiche WebLink
SUNNYSIDE GOLD CORPORATION <br /> AMERICAN TUNNEL BULKHEAD WATER DATA <br /> Date Time Pressure pH Conductivity Temp Comments Discharge Flow H2O Injected <br /> psi s.u. umho C MGal MGal <br /> 16-Jul-96 0 86 0.69 <br /> 17-Jul-96 1 0.69 0.22 <br /> 18-Jul-96 2 01:16 PM 89 4.74 0.69 0.53 <br /> 19-Jul-96 3 07:30 AM 91 0.69 1.52 <br /> 20-Jul-96 4 0.70 1.39 <br /> 21-Jul-96 5 0.70 0.97 <br /> 22-Jul-96 6 07:30 AM 99 5.26 0.71 0.92 <br /> 23-Jul-96 7 07:30 AM 101 5.27 0.73 0.78 <br /> 24-Jul-96 8 07:30 AM 102 5.40 0.73 0.61 <br /> 25-Jul-96 9 07:30 AM 106 5.52 0.75 0.62 <br /> 26-Jul-96 10 07:45 AM 109 6.10 0.75 0.63 <br /> 27-Jul-96 11 07:30 AM 110 6.10 0.75 0.76 <br /> 28-Jul-96 12 07:30 AM 112 6.60 0.71 0.79 <br /> 29-Jul-96 13 07:30 AM 115 6.40 Valve closed later reopened 0.71 0.87 <br /> 30-Jul-96 14 07:15 AM 119 6.44 1.05 0.68 <br /> 31-Jul-96 15 08:00 AM 119 6.54 1.15 0.66 <br /> 01-Aug-96 16 07:30 AM 120 6.34 1.15 0.53 <br /> 02-Aug-96 17 07:30 AM 120 6.30 Valve closed 1.15 0.65 <br /> 03-Aug-96 18 0.81 <br /> 04-Aug-96 19 0.63 <br /> 05-Aug-96 20 08:30 AM 130 5.12 0.639 <br /> 06-Aug-96 21 0.511 <br /> 07-Aug-96 22 08:45 AM 136 5.20 0.497 <br /> 08-Aug-96 23 0.514 <br /> 09-Aug-96 24 08:30 AM 141 5.52 1300 0.445 <br /> 10-Aug-96 25 0.42 <br /> 11-Aug-96 26 0.395 <br /> 12-Aug-96 27 08:30 AM 146 5.52 1190 0.384 <br /> 13-Aug-96 28 0.367 <br /> 14-Aug-96 29 05:00 PM 150 5.28 680 0.16 0.37 <br /> 15-Aug-96 30 08:50 AM 152 5.97 440 Valve opened 0.10 0.367 <br /> 16-Aug-96 31 07:45 AM 151 5.65 1150 1.23 0.367 <br /> 17-Aug-96 32 08:15 AM 150 5.20 1100 11 1.25 0.367 <br /> 18-Aug-96 33 09:40 AM 149 5.41 12 1.24 0.353 <br /> 19-Aug-96 34 06:20 PM 149 5.59 1960 13 1.25 0.353 <br /> 20-Aug-96 35 1.26 0.36 <br /> 21-Aug-96 36 07:50 AM 149 5.65 12 1.26 0.36 <br /> 22-Aug-96 37 1.26 0.367 <br /> 23-Aug-96 38 09:30 AM 148 5.84 12 1.26 0.37 <br /> 24-Aug-96 39 1.26 0.389 <br /> 25-Aug-96 40 06:20 PM 148 5.84 12 1.26 0.324 <br /> 26-Aug-96 41 1.27 0.333 <br /> 27-Aug-96 42 1.27 0.288 <br /> 28-Aug-96 43 1.27 0.264 <br /> 29-Aug-96 44 09:00 AM 148 5.98 1800 12 1.28 0.288 <br /> 30-Aug-96 45 Injection thru SS Basin started 1.28 0.288 <br /> 31-Aug-96 46 1.28 0.288 <br /> 01-Sep-96 47 1.28 0.288 <br /> 02-Sep-96 48 1.28 0.288 <br /> 03-Sep-96 49 10:30 AM 148 8.28 1880 1.28 0.288 <br /> 04-Sep-96 50 05:35 PM 148 9.61 1880 13 1.28 0188 <br /> 05-Sep-96 51 0.88 0.288 <br /> 06-Sep-96 52 09:40 AM 9.77 1780 0.88 0.288 <br /> 07-Sep-96 53 08:00 PM 150 11.70 14 0.47 0.288 <br /> 08-Sep-96 54 0.63 0.288 <br /> 09-Sep-96 55 12:00 AM 151 11.77 3100 12 Valve closed 0.78 0.288 <br /> 10-Sep-96 56 <br /> 0288 <br /> 11-Sep-96 57 0.288 <br /> 12-Sep-96 58 0.288 <br /> 13-Sep-96 59 0.288 <br /> 14-Sep-96 60 0.288 <br />