Laserfiche WebLink
-2- <br /> 4. ESTIMATED DATES OF COMMENCEMENT AND COMPLETION: <br /> Commencement: August , 1987 <br /> Completion*: December 1987 <br /> 5.* MINERAL(S) AND/OR RESOURCE(S) BEING INVESTIGATED: gold, silver, lead, zinc, copper <br /> 6. TYPE OF OPERATION: <br /> Describe the type of operations which will be undertaken in conducting <br /> the prospecting operations. Include equipment to be used, access and <br /> site construction requirements, type of disturbance (drill holes, <br /> trenching, -- shafts, -etc.) , anticipated relationship to surface and <br /> subsurface water (proximity to streams, penetration of ground water <br /> aquifers) , sampling procedures (fluid, bulk, geophysical , etc. ) and any <br /> other pertinent information (attach additional page, if needed) . <br /> Access will be by dozer over existing county and private roads and undisturbed <br /> grounds. The blade will not be lowered on public lands. Drill sites will be leveled <br /> with the dozer to a roughly 40x40 foot pad after topsoil (if present) is pushed to the <br /> side. No drilling will take place in any stream course and a portable mud pit will <br /> be used to keep drilling fluids away from surface and ground waters. Continuous <br /> coring will be employed for sampling, and no cutting will be deposited on the surface. <br /> Drilling fluids will consist of water or water with soap. <br /> 7. RECLAMATION MEASURES: <br /> State -the measures to be taken to reclaim any affected land, and/or <br /> permanently abandon any drill hole, consistent with the applicable <br /> requirements of Rule 5 and Rule 6 and any applicable regulations <br /> promulgated thereunder by the Board (attach additional page, if needed) . <br /> The rig and other equipment will be removed from the site, any oily materials will <br /> then be dozed under the surface at least 12 inches. Topsoil (if present) will be <br /> pushed back over the site, and the site will be reseeded with the approved alpine <br /> seed mixture contained within Exhibit E - Reclamation Plan of the Consolidated Permit <br /> (112) Application for the Sunnyside Mine and Mill (p. E:3 through E:5) , Permit <br /> no, M-77-378. No drill hole abandonment is planned as all holes are being used for <br /> ore body identification, and they will be mined out. Should any hole flow proper - <br /> procedures as stated in rule 5 will be followed. <br />