My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-04-27_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
2000-04-27_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2021 10:55:13 AM
Creation date
5/31/2012 8:53:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
4/27/2000
Doc Name
1st Qtr 2000 Rpt
From
Sunnyside Gold Corp
To
CDPHE-WQCD
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1111111111111111111 <br /> 999 <br /> SUNNYSIDE GOLIZ CORPORATION <br /> AN ECHO DAY COMPANY <br /> P.O. Box 177 • Silverton, CO 81433 <br /> Phone (970) 387-5533 • Fax (970) 387-5310 <br /> April 24, 2000 <br /> Attention: Ron Zdyb <br /> Mail Code. 8D2-W-GW <br /> U S. Environmental Protection Agency <br /> Underground Injection Control (UIC) <br /> 999 181h Street, Suite 500 <br /> Denver, Colorado 80202-2466 <br /> RE: EPA File No. C05000-03745, San Juan County, Colorado <br /> I st Quarter 2000 Report (January — March) <br /> Dear Mr Zdyb: <br /> In accordance with the quarterly reporting requirements of EPA's June 26, 1996 Rule <br /> Authorization letter for injection of water and alkaline material into the Sunnyside Mine, <br /> Sunnyside Gold Corporation (SGC) submits the following report. This report covers the <br /> period from January 1, 2000 through March 31, 2000. <br /> Terry Tunnel Bulkhead <br /> The Terry Tunnel bulkhead was inaccessible during the I'm quarter and no inspections or <br /> sampling occurred The mine pool elevation remained constant at approximately 1 1,619' <br /> elevation based on pressure monitoring at the lower American Tunnel bulkhead <br /> Therefore, the bulkhead pressure should be approximately 28 psi. Quarterly inspections <br /> will occur when the bulkhead is accessible <br />
The URL can be used to link to this page
Your browser does not support the video tag.