Laserfiche WebLink
SUNNYSIDE GOLD CORP. <br /> WATER SAMPLE ANALYSIS <br /> AMERICAN TUNNEL BULKHEAD <br /> Parameter-In units of mg/l unless noted <br /> Station Sampldate FieldpH FieldCond FieldT dCd dCu dPb dZn dFe dMn dAl SULFATE TOTAL HARDNESS <br /> S.U. umho C I <br /> AMERICAN TUNNEL BULKHEAD 30-Mar-99 4.68 2200 9.7 <br /> AMERICAN TUNNEL BULKHEAD 27-Apr-99 4.43 2400 10.0 <br /> AMERICAN TUNNEL BULKHEAD 26-May-99 4.40 2200 14.1 <br /> AMERICAN TUNNEL BULKHEAD 25-Jun-99 4.62 2500 11.1 <br /> AMERICAN TUNNEL BULKHEAD 23-Jul-99 5.09 3000 12.8 <br /> AMERICAN TUNNEL BULKHEAD 24-Aug-99 4.85 3100 11.6 <br /> AMERICAN TUNNEL BULKHEAD 24-Sep-99 5.29 3000 11.7 <br /> AMERICAN TUNNEL BULKHEAD 22-Oct-99 4.84 3100 11.8 <br /> AMERICAN TUNNEL BULKHEAD 29-Nov-99 4.87 2600 13 <br /> AMERICAN TUNNEL BULKHEAD 28-Dec-99 4.88 2600 12.5 <br />