My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-01-31_HYDROLOGY - M1977378
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
2000-01-31_HYDROLOGY - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2021 1:15:28 PM
Creation date
5/31/2012 8:52:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
1/31/2000
Doc Name
4th Quarter 1999 Report
From
Sunnyside Gold Corp
To
EPA
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 1999 Monthly Report <br />Page 2 <br />Sunnyside submitted completion certifications in October, 1997. <br />• Sunnyside Mine Pool Mitigation — Alkaline Solution Injection <br />This project was not active in November of 1999. <br />The water pool pH, at the American Tunnel bulkhead, was 4.87 and the bulkhead gage <br />read 420 psi at the end of November. This would indicate that a rise in the mine pool <br />occurred since the end of October (2 feet). Sunnyside will continue to monitor these <br />parameters. <br />"B List" Projects <br />• Columbus Mine Portals — Mine Waste Dumps <br />• London Mine Portals — Waste Dumps <br />Work, permitting or arrangement for access is not planned until it becomes evident that <br />the work plans for these projects require implementation. <br />• Mayflower Facility — Upland Hydrological Control <br />This project was completed in October, 1999 and accepted by DMG as complying with <br />the Consent Decree work plans and MLR Standards in November, 1999. <br />• Tailings Pond No. 4 Surface Drainage Modification <br />This project was completed in November, 1999 and inspected by DMG for compliance <br />with the Consent Decree work plan and MLR Standards. <br />• Tailings Pond No. 4 Upland Groundwater Diversion <br />Sunnyside had been holding discussions with BLM to implement this project in exchange <br />for an area to place material from their Lackawanna mill tailings remediation project. <br />Since it became apparent that the work on this project would not be completed by BLM <br />in the allotted time frame, Sunnyside assumed project construction. By month end, the <br />work area had been stripped of overburden material to the impermeable clay seam found <br />in the exploratory holes and approximately 400 feet of interception/diversion ditch had <br />been excavated. Projection completion is planned for December. <br />
The URL can be used to link to this page
Your browser does not support the video tag.