Laserfiche WebLink
Slope Evaluation and Remediation <br />West Elk Mine <br />Somerset, Colorado <br />his purposes or find the geotechnical conditions described herein to be at variance with <br />his experience in the greater project area. The contractor is responsible for obtaining <br />the additional geotechnical information that is necessary to develop his workscope and <br />cost estimates with sufficient precision. This includes current depths to groundwater, <br />etc. <br />This report was prepared in accordance with generally accepted soil and foundation <br />engineering practice in the Gunnison County area at the date of preparation. GROUND <br />makes no warranties, either expressed or implied, as to the professional data, opinions <br />or recommendations contained herein. Because of numerous considerations that are <br />beyond GROUND's control, the economic or technical performance of the project cannot <br />be guaranteed in any respect. <br />GROUND appreciates the opportunity to complete this portion of the project and <br />welcomes the opportunity to provide Mountain Coal Company, LLC with a cost proposal <br />for construction observation and materials testing prior to construction commencement. <br />Sincerely, <br />GROUND Engineering Consultants, Inc. <br />Todd Roberts, P.G. <br />Reviewed by James B. Kowalsky, P.E. <br />4. <br />Reviewed by Brian H. Reck, P.G., C.E.G. <br />Job No. 11 -6014 GROUND Engineering Consultants, Inc. Page 14 <br />